BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 28
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

15 live classes from Sep 28, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAT prep PS question

Expert replies
Source: — Problem Solving |

by Pedros » Wed Apr 22, 2009 3:19 pm
is the OA 12 ?
Join the discussion

by Pedros » Wed Apr 22, 2009 3:42 pm
The first hose does 1/20 of the work per hour
The second hose does 1/30 of the work per hour

combining them together; 1/20 + 1/30 = 5/60 = 1/12 per hour

they together finish 1/12 of the work per hour
so 100% of the work will be done in 12 hours. ( cross multiply)

another way to think about it :
Hose 1 finish in 20 hours
Hose 2 finish in 30 hours

so they finish 2 pools in 50 hours
Therefore they finish one pool in 25 hours average if they work independatly. If they work simultinously it would take them together halh that time. which is 12.5 hours ( approximatly )

so i think its 12 not 10.
Join the discussion

by Ian Stewart » Wed Apr 22, 2009 6:20 pm
Pedros wrote: another way to think about it :
Hose 1 finish in 20 hours
Hose 2 finish in 30 hours

so they finish 2 pools in 50 hours
Therefore they finish one pool in 25 hours average if they work independatly. If they work simultinously it would take them together halh that time. which is 12.5 hours ( approximatly )
Your first answer was correct, but the above is not, as you might be able to tell; it gives you a different answer from your first solution, so one of them must be incorrect, of course. You can't average combined rates in the way you've done above.

There is another way to look at the problem:

- If A fills the pool in 20 minutes, two hoses just like A would take 20/2 = 10 minutes. We don't have two hoses like A; we have one like A, and one slower than A, so it must take more than 10 minutes for A+B together.

- If B fills the pool in 30 minutes, two hoses just like B would take 30/2 = 15 minutes. We don't have two hoses just like B; we have one like B, and one faster than B, so the time for A+B together must be less than 15 minutes.

So the answer must be between 10 and 15, and 12 is the only possibility among the answer choices.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com
Join the discussion

by lilu » Wed Apr 22, 2009 8:14 pm
Large hose's rate=1/20
Small's rate=1/30
Add rates together because they need to be working together=1/20+1/30=5/60
Now time=work/rate=1/(5/60)=60/5=12
The more you look, the more you see.
Join the discussion