BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

pool and valves

Expert replies
by ace_gre » Mon Jan 25, 2010 5:58 pm
A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened?
A) at 2:00 pm
B) at 2:30 pm
C) at 3:00 pm
D) at 3:30 pm
E) at 4:00 pm

I did it by backsolvling and ended up with D Does anyone have a better approach?
Join the discussion
Source: — Problem Solving |

by thephoenix » Mon Jan 25, 2010 8:16 pm
I got D ; my way

let after x hrs the drained valve was opened
in x hrs the pool will be filled x/4 @ 1/4
for rest 11-x hrs the pool will be filled @ 1/20----->(11-x)/20
eqn
(x/4)+(11-x)/20=1----->x=2.25----> 2 hrs 35-----> at 3:35 the drained valve is open( the only option nearest is D)

but i am not satisfied with my approach
Join the discussion

by ace_gre » Mon Jan 25, 2010 8:31 pm
After some contemplation, here is my way..

Let the capacity of the pool be x and the number of hours the inlet valve was open be n.
Then 10-n will be the no. of hours both inlet and drain valves were open.

When both inlet and outlet valve was open then net gain in the pool = x/4 - x/5 = x/20

According to the info given,
(x/4) * n + (x/20) * (10-n) = x
Cancelling x through out, and solving for n = 5/2 => 2 1/2 hrs.
Then the drain valve was opened 2 1/2 hrs after the inlet valve was opened. i.e 3.30PM :)
Join the discussion

by fibbonnaci » Mon Jan 25, 2010 8:41 pm
Hey thephoenix, your approach is rite. u made a simple error.

in one hour the inlet pipe fills 1/4th of the tank.
sat x hrs the inlet pipe alone functions. so the amount filled is x/4 th of the tank.

total time is 10 hrs.

the drain works for (10- x) hrs in combination with the inlet.
so in 1 hr (1/4 - 1/5) => 1/20th of the tank gets full
in (10 - x) hrs, (10-x)/20 th of the tank gets filled.

so total tank becomes full in x/4 + (10-x)/ 20 =1
x= 2.5hrs.

so the drain opens two and half hours after 1 PM. ie 3.30
- D
Hope this helps!
Join the discussion

by thephoenix » Mon Jan 25, 2010 8:52 pm
fibbonnaci wrote:Hey thephoenix, your approach is rite. u made a simple error.

in one hour the inlet pipe fills 1/4th of the tank.
sat x hrs the inlet pipe alone functions. so the amount filled is x/4 th of the tank.

total time is 10 hrs.

the drain works for (10- x) hrs in combination with the inlet.
so in 1 hr (1/4 - 1/5) => 1/20th of the tank gets full
in (10 - x) hrs, (10-x)/20 th of the tank gets filled.

so total tank becomes full in x/4 + (10-x)/ 20 =1
x= 2.5hrs.

so the drain opens two and half hours after 1 PM. ie 3.30
- D
Hope this helps!
THANKS I GOT IT
Join the discussion

by bigmonkey31 » Mon Jan 25, 2010 9:55 pm
This is how I did it.. a bit more conceptual...

Rate to fill = 1/4
Rate to drain = 1/5

Since you know the Fill is on for 10 hrs (1pm to 11pm), you can set up the equation to see how long the drain is on:

t = time the drain is on
(1/4)10 - (1/5)(t) = 1
solve for t.. t=7.5 hrs

Subtract 7.5 from 11pm...

=3:30
(D)
Join the discussion

by rahul.s » Sat Jan 30, 2010 9:57 am
bigmonkey31 wrote:This is how I did it.. a bit more conceptual...

Rate to fill = 1/4
Rate to drain = 1/5

Since you know the Fill is on for 10 hrs (1pm to 11pm), you can set up the equation to see how long the drain is on:

t = time the drain is on
(1/4)10 - (1/5)(t) = 1
solve for t.. t=7.5 hrs

Subtract 7.5 from 11pm...

=3:30
(D)
why does it = 1?
Join the discussion

by sars72 » Sat Jan 30, 2010 10:13 am
rahul.s wrote:
bigmonkey31 wrote:This is how I did it.. a bit more conceptual...

Rate to fill = 1/4
Rate to drain = 1/5

Since you know the Fill is on for 10 hrs (1pm to 11pm), you can set up the equation to see how long the drain is on:

t = time the drain is on
(1/4)10 - (1/5)(t) = 1
solve for t.. t=7.5 hrs

Subtract 7.5 from 11pm...

=3:30
(D)
why does it = 1?
The value 1 is used to represent the full tank i.e. complete task
Join the discussion

by bigmonkey31 » Sat Jan 30, 2010 11:02 am
^ exactly. You set up your equation (rate*time=work); and work in this case is 1 pool. Likewise, if the question were asking 1/2 the pool, then work=.5

Hope that helps.
Join the discussion