BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

a very hard OG problem

Expert replies
by hongwang9703 » Mon Nov 23, 2009 6:54 pm
This question HAS to be a 700-800 level question because even with the explanation the OG gave me, I still do not understand it whatsoever... and I have tried to search this to see if it has been posted before but got no result.

here it is

Running at their respective constant rates, Machine X takes 2 days longer to produce W widgets than Machine Y. At theses rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take Machine X alone to produce 2w widgets?

answer is 12
i got utterly defeated by the gmat.
Join the discussion
Source: — Problem Solving |

by adam15 » Mon Nov 23, 2009 7:49 pm
let
ta=time required by machine A
tb=time required by machine B
we know that
w/ta+w/tb=5/4*(w/3)
after arrangement and some algebra we get;
ta=5/12tb
we know also that ta=2+tb or tb=ta-2
then
ta=2/7 for producing w
then for 2w it requires
4/7
thanks for comments and right answer if wrong
Join the discussion

by thephoenix » Mon Nov 23, 2009 9:21 pm
let d days for m/c Y to make w widgets
therefore d+2 days for m/c X to make w widgets

r1 rate for m/c X will w/(d+2)
r2 rate for m/c Y will w/d

combine rate w/(d+2)+w/d=(2wd+2w)/d(d+2)

now combinly x and y complete 5w/4 work in 3 days

i.e 3*[(2wd+2w)/d(d+2)]=5w/4

solving we get
(5d+6)(d-4)=0

taking d=4

x takes 6 days for w widgets
and therefore 12 days for 2w widgets

all this can be done in 2 min using MGmat word problems way of solving rate problem(the chart method)
Join the discussion

by RoadtoIVY » Mon Nov 23, 2009 9:27 pm
But I will still stick to the traditional way of doing this problem. i feel more comfortable.
Join the discussion

by hongwang9703 » Tue Nov 24, 2009 3:35 pm
this is from the OG, so does that mean that it is very possible that we WILL get questions like these!!?

and please correct me if im wrong that this question is one of the hardest...
i got utterly defeated by the gmat.
Join the discussion