BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Arithmetic

Expert replies
by sud21 » Sat Sep 19, 2015 6:12 am
16 horses can haul a load of lumber in 24 minutes. 12 horses started hauling a load and after 14 minutes, 12 mules joined the horses. Will it take less than a quarter-hour for all of them together to finish hauling the load?

1. Mules work more slowly than horses.
2. 48 mules can haul the same load of lumber in 16 minutes.
Join the discussion
Source: — Data Sufficiency |

by Jim@StratusPrep » Mon Sep 21, 2015 1:00 pm
There is no need to do any calculation. You simply need the rate of the mules to be able to answer the question. Statement 2 is your answer. If you want some more information on this take a look here: GMAT Work
GMAT Answers provides a world class adaptive learning platform.
-- Push button course navigation to simplify planning
-- Daily assignments to fit your exam timeline
-- Organized review that is tailored based on your abiility
-- 1,000s of unique GMAT questions
-- 100s of handwritten 'digital flip books' for OG questions
-- 100% Free Trial and less than $20 per month after.
-- Free GMAT Quantitative Review

Image
Join the discussion

by Matt@VeritasPrep » Fri Sep 25, 2015 1:53 am
From the prompt, we know that 16 horses can do the job in 24 minutes. This means ONE horse does (1/16) of the job in 24 minutes, so ONE horse would take 16*24 = 384 minutes to do the job. Hence each horse has a rate of (1/384) of the job per minute.

If 12 horses work for 14 minutes, we have 12*14 = 168 horse-minutes of work. That means we've accomplished 168 * (1/384), or (7/16) of the job.

The next issue is whether the prompt means 15 additional minutes or 15 minutes total. If it means 15 minutes total, then S1 and S2 are BOTH sufficient, as the mules will not be able to do enough work in 1 minute to finish the job.

If it means 15 additional minutes, then we need the mules' rate. S1 doesn't give us that, but S2 does, so only S2 is sufficient.