BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

GMAT PREP WORK PROB?

Expert replies
by dferm » Wed Mar 26, 2008 8:31 am
Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at it's constant rate?

A. 5
B. 16/3
C. 11/2
D. 6
E. 20/3

Please explain....
Join the discussion
Source: — Problem Solving |

by xilef » Wed Mar 26, 2008 9:15 am
x- faster pump
y - slower pump

Work formula:

xy/(x+y)=4


second Eq:

3x/2=y

Solving for x:

[x(3x/2)]/(x+3x/2)=4
3x^2=20x
x^2=20x/3
x(x-20/3)=0

x=0 or x=20/3

Answer E.
Join the discussion

by rajmirra » Wed Mar 26, 2008 9:50 am
I am loosing something here. Could you please detail Xilef. You solved for Y which is the slowest pump and the question asks for the time taken by the fastest pump. Please explain.

Thanks
~R
Join the discussion

by xilef » Wed Mar 26, 2008 10:00 am
rajmirra wrote:I am loosing something here. Could you please detail Xilef. You solved for Y which is the slowest pump and the question asks for the time taken by the fastest pump. Please explain.

Thanks
~R
Made a typo. Solved for x. See above.
Join the discussion

by rajmirra » Wed Mar 26, 2008 10:08 am
Thanks Xilef. What a relief I got it :lol:

~R
Join the discussion

confused on the rates formula

by freedsl » Wed Mar 26, 2008 10:38 am
if the faster pump is 1.5 times the speed of the slower pump, then

x=1.5 y or x = 3y/2

then 2x/3 = y

how do you get:
second Eq:
3x/2=y
Thank, I'm all confused!!
Join the discussion

by xilef » Wed Mar 26, 2008 1:36 pm
You are confusing the fact that x and y are the number of hours it takes for the pump to fill the pool - faster means that the number of hours is smaller not larger.
Join the discussion

by moneyman » Wed Mar 26, 2008 9:16 pm
Let A and B be the two pumps. From the question we understand that,
1/A+1/B=1/4

We also know that 1/A=1/1.5B

Substitute and we get

1/B+1/1.5B=1/4

which is equal to 2.5/1.5B=1/4 (Using LCM)

and so B(which is the faster one) would take 20/3 hours. So the Answer is E.
Maxx
Join the discussion

hey folks

by resilient » Mon Mar 31, 2008 8:42 pm
If we stick to just the basics; ( which gets me out of a lot of trouble)

w=r t

pump 1 slower = 1 job per hour
pump 2 faster = 1.5 jobs per hour

combined rate = 2.5 jobs per hour multiplied by the 4 hour work time.

This yields the W work, which is 10. so simply plug plug back into the w = r t formula. but this time we manipulate the w = rt to t=w/r

w= 10
r= (faster pump) 1.5

so 10/1.5 = 20/3. qa is e
Appetite for 700 and I scraped my plate!
Join the discussion

by cat er ina » Wed Apr 28, 2010 1:21 am
resilient wrote:If we stick to just the basics; ( which gets me out of a lot of trouble)

w=r t

pump 1 slower = 1 job per hour
pump 2 faster = 1.5 jobs per hour

combined rate = 2.5 jobs per hour multiplied by the 4 hour work time.

This yields the W work, which is 10. so simply plug plug back into the w = r t formula. but this time we manipulate the w = rt to t=w/r

w= 10
r= (faster pump) 1.5

so 10/1.5 = 20/3. qa is e
Your are a genius..I hadn t thought to the plug in strategy for this!
Join the discussion

by sk818020 » Wed Apr 28, 2010 10:43 am
I'm just going to throw in another way of thinking about the problem. Maybe it will help you.

The first sentence states, "Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool."

Mathematically this can be expressed as:

(1/x) + (1/y) = 1/4

Logically we can think of this as Pump X completes 1 unit per every x hours (1/x). Pump Y completes 1 unit every y hours. Together the pumps complete 1 unit every 4 hours. If we can figure out what y is, then we know how long it takes Pump Y to complete 1 job.

Next, "the constant rate of one pump was 1.5 times the constant rate of the other."

In this problem we will say Pump Y is the faster pump, so the amount of time it takes Pump X to complete the job (x) is 1.5 times greater than Pump Y. Or mathematically;

x=1.5y

With this information we can solve the problem by substitution. We want to solve for y so we will substitute 1.5y for any x we see. Thus,

(1/1.5y) + (1/y) = (1/4)

To get rid of all the fractions multiply the entire equation by (1.5y)(y)(4), resulting in:

4y + 6y = (1.5y)y ***see note at bottom.

Divide all terms by y to get;

4 + 6 = 1.5y

Simplify;

10=1.5y

10/1.5 = y

y = 20/3

Therefore, Pump y completes 1 job every 20/3 hours (ratio expressed mathematically as 1/y or 1/(20/3).

Hope that helps some.

Thanks,

Jared

*** You want to be careful not to devide variables because they may be 0, but in this problem we know that one pump is working at 1.5 times the rate of another pump, which wouldn't make sense if either number was 0. Thus, i felt it was safe to devide the variable y here.
Join the discussion

by this_time_i_will » Sat May 01, 2010 10:59 am
dferm wrote:Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool. If the constant rate of one pump was 1.5 times the constant rate of the other, how many hours would it have taken the faster pump to fill the pool if it had worked alone at it's constant rate?

A. 5
B. 16/3
C. 11/2
D. 6
E. 20/3

Please explain....
Faster takes x hrs. slower takes = 1.5x hours.

4 = x*1.5x/(x+1.5x)
=>x = 20/3.
Join the discussion

by harshavardhanc » Sat May 01, 2010 11:16 am
sk818020 wrote:I'm just going to throw in another way of thinking about the problem. Maybe it will help you.

The first sentence states, "Two water pumps, working simultaneously at their respective constant rates, took exactly 4 hours to fill a certain swimming pool."

Mathematically this can be expressed as:

(1/x) + (1/y) = 1/4

Logically we can think of this as Pump X completes 1 unit per every x hours (1/x). Pump Y completes 1 unit every y hours. Together the pumps complete 1 unit every 4 hours. If we can figure out what y is, then we know how long it takes Pump Y to complete 1 job.

Next, "the constant rate of one pump was 1.5 times the constant rate of the other."

In this problem we will say Pump Y is the faster pump, so the amount of time it takes Pump X to complete the job (x) is 1.5 times greater than Pump Y. Or mathematically;

x=1.5y

With this information we can solve the problem by substitution. We want to solve for y so we will substitute 1.5y for any x we see. Thus,

(1/1.5y) + (1/y) = (1/4)

To get rid of all the fractions multiply the entire equation by (1.5y)(y)(4), resulting in:

4y + 6y = (1.5y)y ***see note at bottom.

Divide all terms by y to get;

4 + 6 = 1.5y

Simplify;

10=1.5y

10/1.5 = y

y = 20/3

Therefore, Pump y completes 1 job every 20/3 hours (ratio expressed mathematically as 1/y or 1/(20/3).

Hope that helps some.

Thanks,

Jared

*** You want to be careful not to devide variables because they may be 0, but in this problem we know that one pump is working at 1.5 times the rate of another pump, which wouldn't make sense if either number was 0. Thus, i felt it was safe to devide the variable y here.
Jared,

a good one!

speaking of different approaches, here's one from me. Hope you like it.

I think there is a reason to give the faster rate as 1.5 times the other one. Why?

let the slower rate be x , so the other one becomes 1.5x. combined rate 2.5x which is given to be 1/4 or .25 . See? :)

therefore , x is .1 and the faster is .15 or 15/100 .

The times is the inverse of this figure or 100/15.
Regards,
Harsha
Join the discussion

by jcbruin » Tue Jun 01, 2010 7:09 pm
resilient wrote:If we stick to just the basics; ( which gets me out of a lot of trouble)

w=r t

pump 1 slower = 1 job per hour
pump 2 faster = 1.5 jobs per hour

combined rate = 2.5 jobs per hour multiplied by the 4 hour work time.

This yields the W work, which is 10. so simply plug plug back into the w = r t formula. but this time we manipulate the w = rt to t=w/r

w= 10
r= (faster pump) 1.5

so 10/1.5 = 20/3. qa is e
Thanks for keeping it simple! Kudos!
Join the discussion