BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

MGMAT DS Question - Time,Speed,Work(MachinesA&B tablets)

Expert replies
by s777 » Thu Feb 25, 2016 8:43 pm
Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B's total production catches up to Machine A's total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?

(1) Machine A's rate is twice the difference between the rates of the two machines.

(2) The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.


The answer provided is D; Its posted in BTG itself (answered by GMATGuruNY also):

https://www.beatthegmat.com/machines-a-a ... 70314.html

If you approach this question with the concept of relative speed, I get this way:
Tablets = Distance (miles)
Rate (tablets per hour) = Speed (miles per hour)
A: Rate (speed) of machine A.
B: Rate (speed) of machine B.
B > A;


Relative Speed = (Speed of B) - (Speed of A) = (0.5*A);
(this can be derived from (1) and (2) independently)


Time (B catches up with A)
= (Extra Distance/Relative Speed)
= (30+x)/(0.5* A)

I think that the solution provided ignores the number of tablets that A produces after B is turned on. In that case, the numerator of the time to meet will be: (30+x) where x is the number of tablets that A will produce after B is turned on. So, for B to catch up A, B will have to produce 30 (that A already produced) plus x (that A will produce after B is turned on).

I think the answer should be E. Please let me know if I am wrong.
Join the discussion
Source: — Data Sufficiency |

by MartyMurray » Fri Feb 26, 2016 5:55 am
If B can catch up to A, then B must be faster than A.

Using that information, translate the statements exactly.

(1) Machine A's rate is twice the difference between the rates of the two machines.

A = 2(B - A)

A = 2B - 2A

3A = 2B

A = (2/3)B

Since we know that A = (2/3)B, we can calculate how many tablets each will make when the other makes a certain number.

For instance, in the time it takes for B to make 30 tablets, A will make 20.

Every time A makes a 2 tablets, B will make 3, which is 1 more than A makes. So they need to do that 30 times for B to make 30 more tablets than A makes and to thus catch up.

So in catching up B will make 90 tablets while A makes 60.

You don't actually have to do the math though. You just need to realize that the production of one can be determined given the production of the other.

Sufficient.

(2) The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.

A + B = 5(B - A)

A + B = 5B - 5A

6A = 4B

A = (2/3)B

Sufficient.

The correct answer is D.
Marty Murray
Perfect Scoring Tutor With Over a Decade of Experience
MartyMurrayCoaching.com
Contact me at [email protected] for a free consultation.
Join the discussion

by GMATGuruNY » Fri Feb 26, 2016 7:26 am
s777 wrote:Relative Speed = (Speed of B) - (Speed of A) = (0.5*A)
The expression in red is incorrect.
B - A ≠ 0.5A.

An algebraic approach to Statement 1:
Machine A's rate is twice the difference between the rates of the two machines.

A = 2(B-A)
A = 2B - 2A
3A = 2B
B = (3/2)A.

Let t = the time for B to catch up.
Work produced by A in t hours = At.
Since B = (3/2)A, work produced by B in t hours = Bt = (3/2)(At).

At the end of the t hours, A's work = B's work.
But BEFORE the t hours begin, A has already produced 30 tablets.
Implication:
During the t hours, A produces 30 fewer tablets than B.

Since A's work in t hours is equal to 30 less than B's work in t hours, we get:
At = (3/2)At - 30
30 = (1/2)(At)
60 = At.
Thus, the work produced by A in t hours = 60 tablets.
SUFFICIENT.
Last edited by GMATGuruNY on Mon Feb 29, 2016 3:37 am, edited 1 time in total.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by s777 » Sun Feb 28, 2016 8:59 pm
Hello Guru,

Thanks very much for the clarity on this topic. I now understand that I cannot use Relative Speed concept in Work-Time questions. I really appreciate your help.

Just wanted to clarify something in your post; there are a couple of typos:

At the end of t hours, A's work = B's work.
But BEFORE the t hours begin, A (not B) has already produced 30 tablets.
Implication:
During the t hours that A (and B ofcourse) works, A (not B) produces 30 fewer tablets than B (not A).


Since A's (not B's) work in t hours is equal to 30 less than B's (not A's) work in t hours, we get:


(3/2)(At) = At + 30 (no minus sign)
30 = (1/2)(At)
60 = At.

But the concept is absolutely fine. Thanks very much.
Join the discussion

by GMATGuruNY » Mon Feb 29, 2016 3:41 am
s777 wrote:Hello Guru,

Thanks very much for the clarity on this topic. I now understand that I cannot use Relative Speed concept in Work-Time questions. I really appreciate your help.

Just wanted to clarify something in your post; there are a couple of typos:
Good catch.
I've amended my solution as follows:

Let t = the time for B to catch up.
Work produced by A in t hours = At.
Since B = (3/2)A, work produced by B in t hours = Bt = (3/2)(At).

At the end of the t hours, A's work = B's work.
But BEFORE the t hours begin, A has already produced 30 tablets.
Implication:
During the t hours, A produces 30 fewer tablets than B.

Since A's work in t hours is equal to 30 less than B's work in t hours, we get:
At = (3/2)At - 30
30 = (1/2)(At)
60 = At.
Thus, the work produced by A in t hours = 60 tablets.
SUFFICIENT.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion