BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Two models of computers

Expert replies
by metallicafan » Tue Apr 24, 2012 9:08 am
A company has two models of computers, model M and model N. Operating at a constant rate, a model M computer can complete a certain task in 18 minutes and a model N computer can complete the same task in 9 minutes. If the company used the same number of each model of computer to complete the task in 1 minute, how many model M computers were used

(A) 2
(B) 3
(C) 6
(D) 9
(E) 12

Source: www.gmathacks.com

OA: C
Join the discussion
Source: — Problem Solving |

by Shalabh's Quants » Tue Apr 24, 2012 9:43 am
metallicafan wrote:A company has two models of computers, model M and model N. Operating at a constant rate, a model M computer can complete a certain task in 18 minutes and a model N computer can complete the same task in 9 minutes. If the company used the same number of each model of computer to complete the task in 1 minute, how many model M computers were used

(A) 2
(B) 3
(C) 6
(D) 9
(E) 12

Source: www.gmathacks.com

OA: C
Comp M & N's 1 min. job = 1/18+1/9 = 1/6.

It means to complete a job, they need 6 mins. Or to do it 1 min. M & N should be 6 each.
Last edited by Shalabh's Quants on Tue Apr 24, 2012 11:00 pm, edited 1 time in total.
Shalabh Jain,
e-GMAT Instructor
Join the discussion

by tpr-becky » Tue Apr 24, 2012 9:19 pm
Rate problems that do not give a specific amount for the job can best be solved by picking a number for the job so you don't have to work with fraction. In this case you can pick 36 becuase it divides easily into both 9 and 18.

The rate formula is D=R(t) and you often have to use this formula multiple times for different scenarios within a problem.

The first information we get is that M can do the job in 18 minutes that means that 18(M)=36 - thus the rate of M=2.

Next we get that N can do the job in 9 minutes that means 9(N)=36 - the rate of N=4

Then it asks if you are using the same number of each machine and you finish in one minute how many of each machine.

the task stays at 36 because it hasn't changed and the time we are looking for is 1. when machines work together you have to add their rates within the rate formula but here we have some number of each machine thus the combined rate is going to be the sum of that number times each rate.

This gives you the formula: (x(2)+x(4))(1)=36 - which can be solved to 6x=36 thus x=6 and there are 6 of each type of machine, thus the answer is C.
Becky
Master GMAT Instructor
The Princeton Review
Irvine, CA
Join the discussion

by redng » Tue Apr 24, 2012 10:05 pm
M's rate = 1/18
N's rate = 1/9
x = number of machines

(1/18x + 1/9x) * (1min) = 1task
1/6x = 1
x = 6

C
Join the discussion

by spartacus1412 » Tue Apr 24, 2012 11:12 pm
M's rate = 1/18 in 1 minute
N's rate = 1/9 in 1 minute

lets say x number of each m and n machine were used:
therefore, work done in 1 min is:

X*(1/18 + 1/9)
Since all the work is done in 1 min

X*(1/18 + 1/9) = 1
Solving for X, X = 6, therefore 6 machines of M and N each are used.
Its do or die this time!
Practise, practise and practise.
Join the discussion

by Stuart@KaplanGMAT » Tue Apr 24, 2012 11:27 pm
metallicafan wrote:A company has two models of computers, model M and model N. Operating at a constant rate, a model M computer can complete a certain task in 18 minutes and a model N computer can complete the same task in 9 minutes. If the company used the same number of each model of computer to complete the task in 1 minute, how many model M computers were used

(A) 2
(B) 3
(C) 6
(D) 9
(E) 12
Some good solutions posted already; we can also use the basic work formula for two workers:

CT = combined time
A = time for worker 1 to do job on its own
B = time for worker 2 to do job on its own

CT = (A*B)/(A+B)

In this case:

CT = 9*18/(9+18) = 162/27 = 6

Since it takes 6 minutes for 1 of each machine to complete the job, we need 6 of each machine to complete the job in 1 minute: choose (C)!
Image

Stuart Kovinsky | Kaplan GMAT Faculty | Toronto

Kaplan Exclusive: The Official Test Day Experience | Ready to Take a Free Practice Test? | Kaplan/Beat the GMAT Member Discount
BTG100 for $100 off a full course
Join the discussion

by [email protected] » Wed Apr 25, 2012 1:43 am
Model M Computer's Rate = 1/18

Model N Computer's Rate = 1/9

Combined they do it in; 1/18 + 1/9

Actually the equation goes to: 1/18X n1 + 1/9 X n2 = 1

where n1 and n2 are the no.of machines or computers being used of each model i.e M and N

It is specifically given in the question, that the number of computers being used for both the models are the same i.e

n1 = n2

so now the equation turns out to be

n1/18 + n1/9 =1

therefore, n1/18 + 2n1/18 = 1

therefore, 3n1 = 18

therefore, n1 = 6

and so is n2


I hope this really helped to solve the works problem effectively...
IT IS TIME TO BEAT THE GMAT

LEARNING, APPLICATION AND TIMING IS THE FACT OF GMAT AND LIFE AS WELL... KEEP PLAYING!!!

Whenever you feel that my post really helped you to learn something new, please press on the 'THANK' button.
Join the discussion