- sivaelectric
- Master | Next Rank: 500 Posts
- Posts: 439
- Joined: Sat Aug 09, 2008 8:32 am
- Location: India
- Thanked: 34 times
- Followed by:28 members
In order to expand the South Lake Bridge, the city is considering the addition of a $3 toll on vehicles driving westbound on the bridge. Consultants report that since 1,000,000 vehicles travel across the bridge in each direction every year, this toll will provide at least $3,000,000 toward the necessary repairs and expansion.
Which of the following is an assumption required to reach the conclusion proffered by the consultants?
Which of the following is an assumption required to reach the conclusion proffered by the consultants?
- A. Bids for the repair work will not significantly increase between now and when the contracts for the work are issued.
B. The total number of people who commute between the east side of the city and the west side will not significantly decrease.
C. The number of occupants per vehicle will not significantly increase after the institution of the toll.
D. The number of commuters who use public transit options will not significantly increase from its current level between now and the institution of the toll.
E. The number of vehicles that pass westbound across the bridge will not significantly decrease between now and the institution of the toll.
If I am wrong correct me
, If my post helped let me know by clicking the Thanks button
.
Chitra Sivasankar Arunagiri
Chitra Sivasankar Arunagiri

















