BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Two machines, Y and Z, work at constant

Expert replies
by NandishSS » Tue Aug 23, 2016 6:23 am
Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?

A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)

Source:GMATPrep EP 2

OA:E
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Tue Aug 23, 2016 6:39 am
NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?

A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Let's assign a NICE VALUE to the number of items in a batch and go from there.

Machine Y produces 3 items in the same time Machine Z produces 2 items
Let's say there are 3 items in a batch.

Machine Y takes 9 minutes to produce a batch of items
So, machine Y takes 9 minutes to produce 3 items
From the other information, we can conclude that machine Z takes 9 minutes to produce 2 items.
In other words, machine Z produces 1 item every 4.5 minutes.
So, if a batch is 3 items, then the time it takes machine Z to produce a batch = (3)(4.5) = 13.5 minutes


Answer: E

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by DavidG@VeritasPrep » Tue Aug 23, 2016 7:12 am
NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?

A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)

Source:GMATPrep EP 2

OA:E
Note, also that rate and time have a reciprocal relationship. If I'm running at 2 times your speed, I'll cover the same distance in 1/2 the time. Similarly,
If one machine (Y) is working at 3/2 the rate of another machine (Z), it will take 2/3 as much time as the other machine. Y completes the task in 9 minutes. If 9 = (2/3)T, then T = 13.5, or E
Veritas Prep | GMAT Instructor

Veritas Prep Reviews
Save $100 off any live Veritas Prep GMAT Course
Join the discussion

by GMATGuruNY » Tue Aug 23, 2016 7:21 am
NandishSS wrote:Two machines, Y and Z, work at constant rates producing identical items. Machine Y produces 3 items in the same time Machine Z produces 2 items. If machine Y takes 9 minutes to produce a batch of items, how many minutes does it take for machine Z to produce the same number of items?

A. 6
B. 9
C. 9(1/2)
D. 12
E. 13(1/2)
Machine Y produces 3 items in the same time Machine Z produces 2 items.
Implication:
(Y's rate)/(Z's rate) = 3/2.

Rate and time are RECIPROCALS.
Thus:
(Y's time)/(Z's time) = 2/3.

Rephrasing this time ratio, we get:
(Z's time) = (3/2)(Y's time).

Since Y takes 9 minutes to produce a batch, the time for Z to produce a batch = (3/2)(9) = 13.5 minutes.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by Matt@VeritasPrep » Thu Sep 01, 2016 6:12 pm
Let's say that each machine produces x items. We know that

Work = Rate * Time, so

x = 3 * (Y's time)

x = 2 * (Z's time)

and

3 * (Y's time) = 2 * (Z's time)

so (Z's time) = (3/2) * (Y's time), and from there it's a snap :)