BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Gmat prep ratio defective chips

Expert replies
by cat er ina » Sat Feb 13, 2010 1:58 pm
Shipment: S1, S2, S3, S4.
Number of defective chips in the shipment :2, 5, 6, 4.
Total number of chips: 5.000, 12.000, 18.000, 16.000


A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments s1 s2 s3 and s4 combined as shown in the table above. What is the expected number of defective chips in a shipment of 60.000 chips?

A.14 B.20 C.22 D.24 E.25

I haven't slept on this one for two days, please help!
Join the discussion
Source: — Problem Solving |

by akahuja143 » Sat Feb 13, 2010 3:20 pm
I would go with C 22

I tired the varipous combination of shipments and tried substitute the answer choice.

2 shipments of 18 --36 would have deficitve 2 x6 =12
2 shipments of 12 -- 24 would have defective 2X5 = 10

Total defective 22

what is the OA?
Join the discussion

by ajith » Sat Feb 13, 2010 9:40 pm
cat er ina wrote:Shipment: S1, S2, S3, S4.
Number of defective chips in the shipment :2, 5, 6, 4.
Total number of chips: 5.000, 12.000, 18.000, 16.000


A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments s1 s2 s3 and s4 combined as shown in the table above. What is the expected number of defective chips in a shipment of 60.000 chips?

A.14 B.20 C.22 D.24 E.25

I haven't slept on this one for two days, please help!
Total no of Chips in all shipments = 51.000
Total no of defectives = 17

Ratio = 17/51.000

Expected no of defective chips in 60.000 chips = 60.000*17/51.000 = 20

B
Always borrow money from a pessimist, he doesn't expect to be paid back.
Join the discussion

by gmatmachoman » Sat Feb 13, 2010 10:46 pm
ajith wrote:
cat er ina wrote:Shipment: S1, S2, S3, S4.
Number of defective chips in the shipment :2, 5, 6, 4.
Total number of chips: 5.000, 12.000, 18.000, 16.000


A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments s1 s2 s3 and s4 combined as shown in the table above. What is the expected number of defective chips in a shipment of 60.000 chips?

A.14 B.20 C.22 D.24 E.25

I haven't slept on this one for two days, please help!
Total no of Chips in all shipments = 51.000
Total no of defectives = 17

Ratio = 17/51.000

Expected no of defective chips in 60.000 chips = 60.000*17/51.000 = 20

B
@ajith,

How did u count the ratio's with out taking common divisor?
Join the discussion

by ajith » Sat Feb 13, 2010 11:16 pm
cat er ina wrote:
A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments s1 s2 s3 and s4 combined[/b] as shown in the table above. What is the expected number of defective chips in a shipment of 60.000 chips?


See the Highlighted part of the sentence, It asks to consider the combined ratio rather than the individual ratios.

Combined ratio = (Defectives in S1 +Defectives in S2 +Defectives in S3 +Defectives in S4)/(Total chips in S1+Total chips in S2+Total chips in s3+Total chips in S4)

= 17/51.000= 1/3.000
Always borrow money from a pessimist, he doesn't expect to be paid back.
Join the discussion

by ajith » Sat Feb 13, 2010 11:24 pm
gmatmachoman wrote:
@ajith,

How did u count the ratio's with out taking common divisor?
We want to find the combined ratio;combined ratio is not the same as sum of the ratios.

For example, say, I am making 10 mistakes in 100 and if you are making 5 mistakes in 100 -
The ratio of mistakes we make together is not 10/100+5/100 = 15/100 = 15% rather, it is (10+5)/(100+100) = 15/200 = 7.5%

We sum the fractions, finding a common divisor etc... Here we are not summing them.
Always borrow money from a pessimist, he doesn't expect to be paid back.
Join the discussion

by cat er ina » Mon Feb 15, 2010 7:43 am
i GOT IT!! thank you everybody, the correct answer is 20!
Join the discussion

by n2739178 » Tue Nov 08, 2011 1:54 pm
the wording of the question is a bit confusing hey!
Join the discussion

hi

by Scott@TargetTestPrep » Tue Dec 05, 2017 6:24 pm
cat er ina wrote:Shipment: S1, S2, S3, S4.
Number of defective chips in the shipment :2, 5, 6, 4.
Total number of chips: 5.000, 12.000, 18.000, 16.000


A computer chip manufacturer expects the ratio of the number of defective chips to the total number of chips in all future shipments to equal the corresponding ratio for shipments s1 s2 s3 and s4 combined as shown in the table above. What is the expected number of defective chips in a shipment of 60.000 chips?

A.14 B.20 C.22 D.24 E.25
We need to first determine the ratio of the defective chips to the total number of chips for shipments S1, S2, S3, and S4.

Defective Chips = 2 + 5 + 6 + 4 = 17 chips[spoiler]
[/spoiler]
Total Chips = 5,000 + 12,000 + 18,000 + 16,000 = 51,000

Thus the ratio of defective chips to total chips is 17/51,000 = 1/3000. We interpret this ratio as: we would expect 1 defective chip out of every 3,000 chips in the shipment.

To determine the number of defective chips in a shipment of 60,000 chips we can use the following proportion, in which x is the expected number of defective chips in the shipment of 60,000 chips:

1/3,000 = x/60,000

60,000 = 3,000x

x = 20

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion