BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work Rate Problem - 3

Expert replies
by saadishah » Tue Sep 27, 2016 10:43 am
Tom, working alone, can paint a room in 6 hours. Peter and John, working independently, can paint the same room in 3 hours and 2 hours, respectively. Tom starts painting the room and works on his own for one hour. He is then joined by Peter and they work together for an hour. Finally, John joins them and the three of them work together to finish the room, each one working at his respective rate. What fraction of the whole job was done by Peter?

A. 1/9
B. 1/6
C. 1/3
D. 7/18
E. 4/9

I am not able to answer this question. Please help.
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Tue Sep 27, 2016 12:12 pm
saadishah wrote:Tom, working alone, can paint a room in 6 hours. Peter and John, working independently, can paint the same room in 3 hours and 2 hours, respectively. Tom starts painting the room and works on his own for one hour. He is then joined by Peter and they work together for an hour. Finally, John joins them and the three of them work together to finish the room, each one working at his respective rate. What fraction of the whole job was done by Peter?

A. 1/9
B. 1/6
C. 1/3
D. 7/18
E. 4/9
Let the room = 36 units.
Rate for T = 36/6 = 6 units per hour.
Rate for P = 36/3 = 12 units per hour.
Rate for J = 36/2 = 18 units per hour.

Work produced by T in one hour = 6 units.
Remaining work = 36-6 = 30 units.

Combined rate for T+P = 6+12 = 18 units per hour.
Work produced by T+P in one hour = 18 units.
Of these 18 units, the number produced by P = 12.
Remaining work = 30-18 = 12 units.

Combined rate for T+P+J = 6+12+18 = 36 units per hour.
Of these 36 units, the fraction produced by P = 12/36 = 1/3.
Thus, of the remaining 12 units, the number produced by P = (1/3)12 = 4.

(Total for P)/(total work) = (12+4)/36 = 4/9.

The correct answer is E.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by MBA Challengers » Wed Sep 28, 2016 3:07 am
saadishah wrote:Tom, working alone, can paint a room in 6 hours. Peter and John, working independently, can paint the same room in 3 hours and 2 hours, respectively. Tom starts painting the room and works on his own for one hour. He is then joined by Peter and they work together for an hour. Finally, John joins them and the three of them work together to finish the room, each one working at his respective rate. What fraction of the whole job was done by Peter?

A. 1/9
B. 1/6
C. 1/3
D. 7/18
E. 4/9

I am not able to answer this question. Please help.
Let's put in the following symbols:

Rate at which Tom works in an hour is T = 1/6 (Since Tom can paint the room in 6 hours, in one hour he can paint 1/6 of the room)
Rate at which Peter works in an hour is P = 1/3
Rate at which John works in an hour is J = 1/2

We also need two combined rates:
Hourly rate of work with Tom & Peter working together - TP = 1/6 + 1/3 = 3/6 = 1/2
Hourly rate of work with all 3 working together = TPJ = 1/6 + 1/3 + 1/2 = 6/6 = 1

Now, coming to the problem:
For the first one hour Tom works alone. This implies that in hour 1:
Room painted = 1/6 (hourly rate of work for Tom)
Room remaining to be painted = 1 - 1/6 = 5/6

In the second hour Peter joins Tom:
Room painted in hour 2 = 1/2 (Hourly rate of painting for TP)
Room painted at the end of hour 2 = 1/6 + 1/2 = 4/6 = 2/3
Room remaining to be painted = 1/3

Now, check how long will the 3 of them take to paint this remaining 1 room:
Time taken for the 3 of them to paint the remaining room = 1/3 / 1 (Task/Rate) = 1/3
Thus, the 3 of them work for 20 minutes more.

This gives you the total time that Peter has worked on the job ie the second hour and the last 20 minutes = 1 + 1/3 = 4/3
The proportion of work that Peter would have done would be calculated by multiplying the time with the rate:
4/3 x 1/3 = 4/9

Thus, Peter painted 4/9 of the room. The answer is E
Log on to www.mbachallengers.com for
Easy strategic GMAT prep
For any queries mail us at [email protected]
Follow MBA Challengers on Facebook
Join the discussion

by Matt@VeritasPrep » Thu Sep 29, 2016 6:50 pm
Think of the room as being made of blocks. Let's say the room has 12 blocks. Tom can do this in 6 hours, so he can paint 2 blocks per hour. Likewise, Peter can paint 4 and John can paint 6.

When the guys work together, we get

First hour = 2, by Tom
Second hour = 6, by Tom and Peter

So we only have 4 blocks left. John + Peter + Tom can do 12 blocks in an hour, so 4 blocks will only take 20 minutes, or (1/3) of an hour.

That means that Peter does 4 blocks in hour two + (1/3)*4 blocks in "hour" three (the last 20 minutes).

Thus Peter does (4 + 4/3) out of the 12 total blocks, or 4/9 of the job.
Join the discussion

by Matt@VeritasPrep » Thu Sep 29, 2016 6:53 pm
An even easier (but less intuitive) way would be to see that our ratio is going to be

4 * Peter's time / 12

or Peter's time / 3.

Since Peter will work for MORE than an hour (he does hour two plus some of "hour" three), Peter's time / 3 must be > 1 / 3.

From there, the answer is D or E, but if Peter's time / 3 = 7/18, Peter's time = some hideous fraction. That's unlikely, so the answer "must" be E!
Join the discussion

by Jeff@TargetTestPrep » Sat Jul 14, 2018 6:03 pm
saadishah wrote:Tom, working alone, can paint a room in 6 hours. Peter and John, working independently, can paint the same room in 3 hours and 2 hours, respectively. Tom starts painting the room and works on his own for one hour. He is then joined by Peter and they work together for an hour. Finally, John joins them and the three of them work together to finish the room, each one working at his respective rate. What fraction of the whole job was done by Peter?

A. 1/9
B. 1/6
C. 1/3
D. 7/18
E. 4/9
Tom's rate = 1/6, Peter's rate = 1/3, and John's rate = 1/2.

We can let x = the number of hours John works, so x + 1 = the number of hours Peter works and x + 2 = the number of hours Tom works. We can create the following equation:

(1/6)(x + 2) + (1/3)(x + 1) + (1/2)x = 1

Multiplying the equation by 6, we have:

x + 2 + 2(x + 1) + 3x = 6

x + 2 + 2x + 2 + 3x = 6

6x = 2

x = 1/3

So Peter works for 1/3 + 1 = 4/3 hours, and the fraction of the whole job he does is (1/3)(4/3) = 4/9.

Answer: E

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion