BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Each machine at a toy factory assembles a certain kind of

Expert replies
by AAPL » Thu Jan 02, 2020 4:10 pm
Official Guide

Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20%
B. 25%
C. 30%
D. 40%
E. 50%

OA A
Join the discussion
Source: — Problem Solving |

by Jay@ManhattanReview » Thu Jan 02, 2020 9:00 pm
AAPL wrote:Official Guide

Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20%
B. 25%
C. 30%
D. 40%
E. 50%

OA A
Say there are 100 machines; thus each of these 100 machines assembles 60/3 = 20 toys in an hour

Thus, in one hour, the 100 machines assemble 20*100 = 2,000 toys.

After the replacement of 40% machines with newer and relatively more efficient ones. So, now there are 60 old and 40 newer machines. Each of these 40 newer machines assembles 60/2 = 30 toys in an hour

1. No. of toys assembled by 60 old machines in 1 hour = 20*60 = 1,200;
2. No. of toys assembled by 40 newer machines in 1 hour = 30*40 = 1,200;

Thus, now, the total no. of toys assembled in one hour = 1,200 + 1,200 = 2,400.

The percent increase in the number of toys assembled in one-hour = [(2,400 - 2,000)/2,000]*100% = 20%

The correct answer: A

Hope this helps!

-Jay
_________________
Manhattan Review

Locations: Manhattan Review Warangal | GMAT Prep Dilsukhnagar | GRE Prep Begumpet | Visakhapatnam GRE Coaching | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
Join the discussion

by Scott@TargetTestPrep » Sat Jan 04, 2020 7:19 pm
AAPL wrote:Official Guide

Each machine at a toy factory assembles a certain kind of toy at a constant rate of one toy every 3 minutes. If 40 percent of the machines at the factory are to be replaced by new machines that assemble this kind of toy at a constant rate of one toy every 2 minutes, what will be the percent increase in the number of toys assembled in one hour by all the machines at the factory, working at their constant rates?

A. 20%
B. 25%
C. 30%
D. 40%
E. 50%

OA A
The rate of one old machine is 20 toys per hour. The rate of one new machine is 30 toys per hour.

Let's assume that there are 10 old machines. So, before any of them are replaced, the number of toys produced in an hour is 10 x 20 = 200.

Since 40 percent of the old machines are replaced with new machines, we have now 6 old machines and 4 new machines, and the number of toys produced in an hour is 6 x 20 + 4 x 30 = 240.

Therefore, the percent increase in the productivity per hour is:

(New - Old)/Old x 100 = (240 - 200)/200 x 100 = 40/200 x 100 = 20 percent

Answer: A

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion