BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Ratios

Expert replies
by finance » Sat Jul 23, 2011 2:36 am
It takes the average dryer 80 minutes to dry one full load of Bob's laundry. Bob has
one average dryer, and also decides to try one "Super Jumbo-Iron Dryer-Matic",
which is faster than the average dryer by a ratio of 5 : 4. Bob has three loads of
laundry, and both machines are so precise that he can set them to the minute. How
many minutes does it take for him to dry his three loads? (Assume that no time
passes between loads and that he can use both machines concurrently. Assume also
that he never runs a machine with less than a full load. Finally, assume that Bob
does not partially dry a load in one machine and then switch it to the other.)

How would you solve this question if switching were allowed??
Join the discussion
Source: — Problem Solving |

by winniethepooh » Sat Jul 23, 2011 2:51 am
I will first assume this is surely not a Gmat question.
You haven't even posted the options.
Remember an average Gmat question wont take you more than 30 secs to read and understand by reading it once!

Now the assumption in the problem and the solution:

The answer is 128 minutes.
The New machine is fasterby the ratio 5:4
So, the new machine takes 80*4/5 = 64 mins to dry a full load .
The old machine(working concurrently dries the clothes in 80 mins).
As the new machine completes the work in 64 minutes the the third load is loaded and dried in anotheer 64 minutes.
Hence, total 128 minutes.
Join the discussion

by winniethepooh » Sat Jul 23, 2011 2:51 am
I will first assume this is surely not a Gmat question.
You haven't even posted the options.
Remember an average Gmat question wont take you more than 30 secs to read and understand by reading it once!

Now the assumption in the problem and the solution:

The answer is 128 minutes.
The New machine is fasterby the ratio 5:4
So, the new machine takes 80*4/5 = 64 mins to dry a full load .
The old machine(working concurrently dries the clothes in 80 mins).
As the new machine completes the work in 64 minutes the the third load is loaded and dried in anotheer 64 minutes.
Hence, total 128 minutes.
Join the discussion