BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Word Trans (Fractions): Company S produces two kinds of ster

Expert replies
by II » Mon May 05, 2008 3:49 pm
Company S produces two kinds of stereos: basic and deluxe. Of the stereos produced by Company S last month, 2/3 were basic and the rest were deluxe. If it takes 7/5 as many hours to produce a deluxe stereo as it does to produce a basic stereo, then the number of hours it took to produce the deluxe stereos last month was what fraction of the total number of hours it took to produce all the stereos?

A) 7/17
B) 14/31
C) 7/15
D) 17/35
E) 1/2

Whats the best approach to tackle this one ?
Thanks.
II
Join the discussion
Source: — Problem Solving |

by tmmyc » Mon May 05, 2008 8:20 pm
For me, I would approach it by first translating english into math, then picking smart numbers.

First, we know
2/3 basic in a month
1/3 deluxe in a month

Then we know it takes 7/5 to make a deluxe than a basic
Pick smart numbers
Assume Basic = 5
Then Deluxe = (7/5) * 5 = 7

Then we want deluxe hours over total hours in a month
Pick smart numbers
Assume Basic = 2
Then Deluxe = 1

Basic hours in a month = 2*5 = 10
Deluxe hours in a month = 1*7 = 7
Total hours = 10 + 7 = 17

Deluxe / Total = 7/17

Please let me know if the answer is the correct and if the approach makes sense.
Join the discussion

by akshatsingh » Mon May 05, 2008 9:01 pm
Company S produces two kinds of stereos: basic and deluxe. Of the stereos produced by Company S last month, 2/3 were basic and the rest were deluxe. If it takes 7/5 as many hours to produce a deluxe stereo as it does to produce a basic stereo, then the number of hours it took to produce the deluxe stereos last month was what fraction of the total number of hours it took to produce all the stereos?

A) 7/17
B) 14/31
C) 7/15
D) 17/35
E) 1/2

I think sometimes its better to have a generalised solution, coz there might be questions where substituting values might not help..so here is the solotion

Let the total no. pieces manufactured be X
Basic Deluxe
No. of pieces (2/3)X (1/3)X
Time taken Y (7/5)Y

Total time taken to manufacture Basic ones (2/3)XY
Total time taken to manufacture Deluxe ones (7/15)XY
Total time taken to manufacture Both = (2/3)XY + (7/15)XY = (17/15)XY

Time for Deluxe:Time for both = {(7/15)XY}/{(17/15)XY} = 7/17
Aks
Join the discussion

by netigen » Wed May 07, 2008 12:55 pm
Best approach in such question is assume numbers:

lets say total 3 stereos were produced

2 = basic 1=delux

Time to produce delux = (7/5)T
Time to produce basic = 2 x T

total time = (7/5)T+2T = (17/5)T

delux/total = (7/5)T / (17/5)T = 7/17
Join the discussion

by II » Thu May 15, 2008 6:01 am
7/17 is the correct answer. Thanks.

I agree... best approach on these types of questions is to plug smart numbers.

Thanks for your input folks.
II
Join the discussion

by ssgmatter » Sun Jun 13, 2010 5:43 am
I am not clear on this one?

Is there a better approach to handle this toughie?

Please help
Best-
Amit
Join the discussion

by adi_800 » Wed Oct 12, 2011 10:23 am
Let the total stereos be 60.
So Basic: 40, Delux: 20..
Let the Basic one takes 25 hours to produce..
So the delux one wud take 35 hours..
So total time for Basic : 40 * 25
Total time for Delux : 20 * 35
Answer you are looking for: 20 * 35/(20 * 35 40 * 25 )

= 700/1700 = 7 /17 and answer is D..
Join the discussion

by GMATGuruNY » Thu Oct 13, 2011 4:09 am
II wrote:Company S produces two kinds of stereos: basic and deluxe. Of the stereos produced by Company S last month, 2/3 were basic and the rest were deluxe. If it takes 7/5 as many hours to produce a deluxe stereo as it does to produce a basic stereo, then the number of hours it took to produce the deluxe stereos last month was what fraction of the total number of hours it took to produce all the stereos?

A) 7/17
B) 14/31
C) 7/15
D) 17/35
E) 1/2

Whats the best approach to tackle this one ?
Thanks.
II
Plug in SMALL numbers.

Let the number of stereos = 3.
Since 2/3 were basic:
Basic stereos = 2.
Deluxe stereos = 1.

Let the number of hours to produce a basic stereo = 5.
Then the number of hours to produce a deluxe stereo = (7/5)*5 = 7.

Total number of hours to produce the 2 basic stereos = 5*2 = 10.
Total number of hours to produce the 1 deluxe stereo = 7.

Deluxe stereo hours/Total hours = 7/(10+7) = 7/17.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion