BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

In the "Mashburn" pharmaceutical company there are

Expert replies
by BTGmoderatorDC » Thu Nov 08, 2018 2:08 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty

In the "Mashburn" pharmaceutical company there are two machines - a machine that produces blue pills and a machine that produces red pills. The machines are operated 10 hours a day, and the daily quota of the "blue" machine is 20% greater than that of the red machine. "¨If the "blue" machine was switched on at 8:00 and the "red" machine at 10:45, at what time will half of the combined daily quota be manufactured?

A. 13:15
B. 14:15
C. 14:30
D. 15:40
E. 19:15

OA B

Source: Economist GMAT
Join the discussion
Source: — Problem Solving |

by Scott@TargetTestPrep » Sun Nov 11, 2018 7:24 pm
BTGmoderatorDC wrote:In the "Mashburn" pharmaceutical company there are two machines - a machine that produces blue pills and a machine that produces red pills. The machines are operated 10 hours a day, and the daily quota of the "blue" machine is 20% greater than that of the red machine. "¨If the "blue" machine was switched on at 8:00 and the "red" machine at 10:45, at what time will half of the combined daily quota be manufactured?

A. 13:15
B. 14:15
C. 14:30
D. 15:40
E. 19:15
Let the daily quota for the red machine be 100 pills, so the daily quota for the blue machine is 120 pills. Thus, the combined daily quota is 220 pills.

Since each machine is operated 10 hours a day, the rate of the red machine is 10 pills per hour and the rate of the blue machine is 12 pills per hour. So their combined rate is 22 pills per hour. Therefore, they need to produce a total of 110 pills to satisfy half of the combined daily quota. However, since the blue machine has worked 2 hour 45 minutes before the red machine does, the blue machine has produced 2.75 x 12 = 33 pills. Therefore, when they work together starting at 10:45, they need to produce only 110 - 33 = 77 pills. We can create the following equation where t = the number of hours they work together to produce 77 pills:

22t = 77

t = 77/22 = 7/2 = 3.5

So they will produce half of the combined daily quota by 10:45 + 3.5 hours = 10:45 + 3:30 = 14:15.

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion