- dlencz
- Senior | Next Rank: 100 Posts
- Posts: 42
- Joined: Tue Dec 20, 2011 6:26 pm
- Thanked: 2 times
- Followed by:1 members
By themselves, crane operators A, B, and C can load a particular ship with containers in 5 hours, 7 hours, and 8 hours, respectively. What is the ratio of the time that it takes crane operators B and C to load this ship, working together at their individual rates, to the time it takes crane operator A working alone at her respective rate?
(A) 12/13
(B) 58/75
(C) 56/75
(D) 56/99
(E) 56/113
OA is C
(A) 12/13
(B) 58/75
(C) 56/75
(D) 56/99
(E) 56/113
OA is C












