BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work

Expert replies
by sivaelectric » Sat Jun 04, 2011 10:33 am
It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5
If I am wrong correct me :), If my post helped let me know by clicking the Thanks button ;).

Chitra Sivasankar Arunagiri
Join the discussion
Source: — Problem Solving |

by MBA.Aspirant » Sat Jun 04, 2011 10:44 am
James rate 1/2

Fred rate 1/3

James + Fred 1/2 + 1/3 = 5/6

Time required by both = 1/5/6 = 6/5

:p
Join the discussion

by MBACRACKER » Sat Jun 04, 2011 11:04 am
1/2 + 1/3 = 5/6 of work in 1 hour.
To complete the work, the time required will be 6/5 hours.
Join the discussion

by smackmartine » Sat Jun 04, 2011 11:23 am
IMO C
Best way to tackle work related problems is to use basic formula RT=D , where R= rate, T= time and D = work

Rj(2) = 1
Rf(3) = 1

When James and Fred work together, their respective rate gets added

So, (Rj+Rf)* T =1
(1/2 + 1/3)* T = 1
(5/6)* T =1
T = 6/5
Join the discussion

by jainnikhil02 » Sat Jun 04, 2011 12:06 pm
Its the normal logic we use in the work related problem.... answer is 6/5[/url]
Nikhil K Jain
____________________

"Life is all about timing" Don't waste your and others time.
Join the discussion

by pemdas » Sat Jun 04, 2011 12:19 pm
i would answer c and 6/5 if a word selected in the text would be replaced with the word 'together' likewise, speed of James 1/2 and speed of Fred 1/3; their combined speed 1/2 + 1/3 =5/6 and the time spend for a job is 1 : 5/6 or 6/5

BUT it says simultaneously, hence 5 and e
sivaelectric wrote:It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5
Success doesn't come overnight!
Join the discussion

by Stuart@KaplanGMAT » Sat Jun 04, 2011 12:33 pm
sivaelectric wrote:It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5
Hi,

there's a very simple formula to solve 2-worker problems:

Combined Time = (t1*t2)/(t1+t2)

So, we simply have:

CT = (2*3)/(2+3) = 6/5

That formula is derived from the more standard work formula:

1/(combined time) = 1/t1 + 1/t2+ 1/t3 + ...

in which t1, t2, t3 and so on are the times it takes individual workers to complete a job.
Image

Stuart Kovinsky | Kaplan GMAT Faculty | Toronto

Kaplan Exclusive: The Official Test Day Experience | Ready to Take a Free Practice Test? | Kaplan/Beat the GMAT Member Discount
BTG100 for $100 off a full course
Join the discussion

by Frankenstein » Sat Jun 04, 2011 12:45 pm
pemdas wrote:i would answer c and 6/5 if a word selected in the text would be replaced with the word 'together' likewise, speed of James 1/2 and speed of Fred 1/3; their combined speed 1/2 + 1/3 =5/6 and the time spend for a job is 1 : 5/6 or 6/5

BUT it says simultaneously, hence 5 and e
Hi,
'simultaneously' means 'at the same time'. Why will it be '5'?
Cheers!

Things are not what they appear to be... nor are they otherwise
Join the discussion

by pemdas » Sat Jun 04, 2011 1:18 pm
If you and me work on the same project BUT we aren't told to work together - ONLY at the same time (simultaneously); it takes you 2 hours and me 3 hours. How long will it take both of us to work through the same job? I guess I will be spending 2 hours of my time and you need to spend 3 hours of your time. It should take us 5 hours to complete the same job, agree?

look options a and d are identical even

@seva, please reveal the source and OA

it must be mistake in this q. I tend to select c but the text is asking for e
Stuart Kovinsky wrote: 1/(combined time) = 1/t1 + 1/t2+ 1/t3 + ...

in which t1, t2, t3 and so on are the times it takes individual workers to complete a job.
I used exactly this approach above where 1/t1 + 1/t2+ 1/t3 + ... is combined speed and

1/(combined time) = combined speed (by allowing 1 as the whole or ONE job)
Success doesn't come overnight!
Join the discussion

by edvhou812 » Sat Jun 04, 2011 2:12 pm
sivaelectric wrote:It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5
The answer to these is always the reciprocal of the sum of the fractions.
Join the discussion

by Frankenstein » Sat Jun 04, 2011 7:39 pm
pemdas wrote:If you and me work on the same project BUT we aren't told to work together - ONLY at the same time (simultaneously); it takes you 2 hours and me 3 hours. How long will it take both of us to work through the same job? I guess I will be spending 2 hours of my time and you need to spend 3 hours of your time. It should take us 5 hours to complete the same job, agree?

it must be mistake in this q. I tend to select c but the text is asking for e
Hi,
I think your explanation is unnecessarily(unintentionally) misleading. The meaning of the question is working together. If both are working at the same time, why would it take 2 hours for one and 3 hours for the other. Let me try to explain this part. If it is taking 2 hours for one, that means you are assuming the other guy hasn't worked on that lawn for the 2 hours.Similarly, for the other. One more thing is if you are adding 2 hours and 3 hours, that means one has already done the work of mowing the lawn and then the second one is again doing the same after the first one has completed.
Even if the wording doesn't say working together, still 'working simultaneously' is closer in meaning to working together than 'one doing the work and then another doing the same work which has already been done'.
Cheers!

Things are not what they appear to be... nor are they otherwise
Join the discussion

by cans » Sat Jun 04, 2011 7:58 pm
work=1

Thuse Rate james=1/2 and rate fred=1/3
total rate=5/6. work=1
time=6/5
IMO D
If my post helped you- let me know by pushing the thanks button ;)

Contact me about long distance tutoring!
[email protected]

Cans!!
Join the discussion

by pemdas » Sat Jun 04, 2011 8:09 pm
@Frankenstein, it was said - i tend for c

i understand wording may be confusing, and it is
e was off-price for this question and i keep c as the final answer
basically we are done with the same answer choice, as per my earliest explanation
Success doesn't come overnight!
Join the discussion

by chilledlife » Sun Jun 05, 2011 12:28 pm
sivaelectric wrote:It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5

John's Rate * time = work
John's Rate * 2 = 1
John's rate = 1/2

Similarly, Fred's rate is 1/3.

Their combined rate for one hour is:-
(1/2 + 1/3 ) * 1 = work
5/6 is the amount of work they can complete in one hour.

Total amount of work they need to complete is 1.

Therefore,

Rate * time = work
5/6 * time = 1

Solution: Time needed is 6/5
Join the discussion

by GMATGuruNY » Sun Jun 05, 2011 4:10 pm
sivaelectric wrote:It takes James 2 hours to mow a lawn and Fred 3 hours to mow the same lawn. How many hours would it take both men working simultaneously at their respective constant rates, to mow the lane?
  • A. 5/6
    B. 1
    C. 6/5
    D. 5/6
    E. 5
Let job = 6 units.
Rate for James = w/t = 6/2 = 3 units per hour.
Rate for Fred = w/t = 6/3 = 2 units per hour.
Combined rate for James and Fred = 3+2 = 5 units per hour.
Time for James and Fred to complete the job = w/r = 6/5 hours.

The correct answer is C.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion