BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

-ve Series

Expert replies
by manu.pant » Sun Feb 06, 2011 11:11 pm
A chemical plant has four tanks (A, B, C and D), each containing 1000 litres of a
chemical. The chemical is being pumped from one tank to another as follows:
From A to B @ 20 litres/minute From C to A @ 90 litres/minute From A to D @ 10
litres/minute From C to D @ 50 litres/minute From B to C @ 100 litres/minute
From D to B @ 110 litres/minute Which tank gets emptied first and how long does it
take (in minutes) to get empty after pumping starts?


Ans: C, 20
Join the discussion
Source: — Problem Solving |

by jaxis » Sun Feb 06, 2011 11:34 pm
manu.pant wrote:A chemical plant has four tanks (A, B, C and D), each containing 1000 litres of a
chemical. The chemical is being pumped from one tank to another as follows:
From A to B @ 20 litres/minute From C to A @ 90 litres/minute From A to D @ 10
litres/minute From C to D @ 50 litres/minute From B to C @ 100 litres/minute
From D to B @ 110 litres/minute Which tank gets emptied first and how long does it
take (in minutes) to get empty after pumping starts?


Ans: C, 20
Shouldnt it be D,20.
Join the discussion

by manu.pant » Mon Feb 07, 2011 12:11 am
Correction: D, 20
Join the discussion

by Anurag@Gurome » Mon Feb 07, 2011 12:13 am
manu.pant wrote:From A to B @ 20 L/min
From C to A @ 90 L/min
From A to D @ 10 L/min
From C to D @ 50 L/min
From B to C @ 100 L/min
From D to B @ 110 L/min
Let us determine the final IN(+) or OUT(-) rate for each of the tank,
  • For A : -20 (to B) + 90 (from C) - 10 (to D) = +60 L/min
    For B : +20 (From A) - 100 (to C) + 110 (from D) = +30 L/min
    For C : -90 (to A) - 50 (to D) + 100 (from B) = -40 L/min
    For D : +10 (from A) + 50 (from C) - 110 (to B) = -50 L/min
As D has the maximum outlet rate of 50L/min, it'll empty first.
It'll take (1000/50) = 20 min to empty.
Anurag Mairal, Ph.D., MBA
GMAT Expert, Admissions and Career Guidance
Gurome, Inc.
1-800-566-4043 (USA)

Join Our Facebook Groups
GMAT with Gurome
https://www.facebook.com/groups/272466352793633/
Admissions with Gurome
https://www.facebook.com/groups/461459690536574/
Career Advising with Gurome
https://www.facebook.com/groups/360435787349781/
Join the discussion

by manu.pant » Mon Feb 07, 2011 7:56 pm
how can we find the time taken thru -ve series??