BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

time and work

Expert replies
by anjaligeorge1 » Thu Jun 12, 2008 9:40 am
Pump X started filling an empty pool with water and continued at a constant rate. 5 hours later, the pool was 1/4 full. Then, pump B joined the work. 9 hours later, the pool was full. Working alone at its constant rate, how long will it take B to fill the empty pool?

(A) 15
(B) 18
(C) 20
(D) 30
(E) 45

answer is D.How do i solve this
Join the discussion
Source: — Problem Solving |

Re: time and work

by durgesh79 » Thu Jun 12, 2008 9:52 am
anjaligeorge1 wrote:Pump X started filling an empty pool with water and continued at a constant rate. 5 hours later, the pool was 1/4 full. Then, pump B joined the work. 9 hours later, the pool was full. Working alone at its constant rate, how long will it take B to fill the empty pool?

(A) 15
(B) 18
(C) 20
(D) 30
(E) 45

answer is D.How do i solve this
Pump X fills 1/4 of the Pool in 5 hrs. Means it'll take 4X5=20 hrs for X to fill the total pool alone.

Both X and Y fill 3/4 of the pool in 9 hrs. Mean it'll take 9*4/3 = 12 hrs for both X and Y to fill the total pool.

1/Y + 1/20 = 1/12

Y = 30. Option D
Join the discussion