BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Working alone at its constant rate, machine A can complete a

Expert replies
by Max@Math Revolution » Tue May 01, 2018 4:59 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

[GMAT math practice question]

Working alone at its constant rate, machine A can complete a job in 24 hours. The work rate of machine B is 1/2 that of machine A. If machine A works on the job for 6 hours and machine B completes the job, how long does it take machine B to finish the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 32hrs
E. 36hrs
Last edited by Max@Math Revolution on Thu May 03, 2018 1:01 am, edited 1 time in total.
Join the discussion
Source: — Problem Solving |

Max@Math Revolution wrote:[GMAT math practice question]

Working alone at its constant rate, machine A can complete a job in 24 hours. The work rate of machine B is 1/2 that of machine A. If machine A works on the job for 6 hours and machine B completes the job, how long does it take machine B to finish the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 32hrs
E. 36hrs
Working alone at its constant rate, machine A can complete a job in 24 hours. The work rate of machine B is 1/2 that of machine A.
So, it must take Machine B 48 hours to complete the job.

Now let's assign a nice value to the job. That is, we'll assign a value that works well with 24 hours and 48 hours.
Let's say that the entire job consists of making a total of 48 widgets

If it take Machine A 24 hours to make 48 widgets, then machine A's RATE = 2 widgets per HOUR
If it take Machine B 48 hours to make 48 widgets, then machine B's RATE = 1 widget per HOUR

If machine A works on the job for 6 hours . . .
At a rate of 2 widgets per HOUR, machine A can make 12 widgets in 6 hours
So, the amount of work remaining = 48 widgets - 12 widgets = 36 widgets

. . . and machine B completes the job, how long does it take machine B to finish the job?
Machine B must make the 36 widgets
Machine B's RATE = 1 widget per HOUR
Time = output/rate = 36/1 = 36

It will take machine B 36 hours to complete the job.

Answer: E

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Jeff@TargetTestPrep » Wed May 02, 2018 9:28 am
Max@Math Revolution wrote:
Working alone at its constant rate, machine A can complete a job in 24 hours. The work rate of machine B is 1/2 that of machine A. If machine A works on the job for 6 hours and machine B completes the job, how long does it take machine B to finish the job?

A. 12hrs
B. 16hrs
C. 24hrs
D. 32hrs
E. 36hrs
The rate of machine A is 1/24, and the rate of machine B is 1/48.

After machine A has worked for 6 hours, 1/24 x 6 = 6/24 = 1/4 of the job has been completed, so machine B needs to complete the remaining 3/4 of the job.

Thus, it takes machine B a total of (3/4)/(1/48) = (48 x 3)/4 = 12 x 3 = 36 hours to complete the job.

Answer: E

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion

by Max@Math Revolution » Thu May 03, 2018 1:02 am
=>

Suppose W is the total amount of work required to do the job and that RA and RB are the work rates of machines A and B, respectively.
Then the original condition tells us that RB = (1/2)RA.

Since machine A worked on the job for 6 hours, 1/4 of the job has been done, and (3/4)W is left.
The time T that machine B takes to complete the job is T = (3/4)W / RB = (3/4)W / (1/2)RA = (6/4)W/RA = (6/4)*24 = 36.

Therefore, the answer is E.

Answer: E
Join the discussion