Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B's total production catches up to Machine A's total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?
(1) Machine A's rate is twice the difference between the rates of the two machines.
(2) The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.
OAD
Machines A and B each produce tablets
This topic has expert replies
- GMATGuruNY
- GMAT Instructor
- Posts: 15539
- Joined: Tue May 25, 2010 12:04 pm
- Location: New York, NY
- Thanked: 13060 times
- Followed by:1906 members
- GMAT Score:790
For B to catch up to A, B's rate MUST be faster than A's rate.Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B's total production catches up to Machine A's total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?
(1) Machine A's rate is twice the difference between the rates of the two machines.
(2) The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.
The rate at which B will CATCH UP to A is equal to the DIFFERENCE between the two rates: B-A.
Statement 1: Machine A's rate is twice the difference between the rates of the two machines.
Test TWO cases.
Case 1: A's rate = 2 tablets per hour
Since A's rate is twice the difference between the two rates, B's rate = 3 tablets per hour, so that B-A = 3-2 = 1.
Time for B to catch up = w/(rate difference) = 30/1 = 30 hours.
Work produced by A in 30 hours = r*t = 2*30 = 60 tablets.
Case 2: A's rate = 4 tablets per hour
Since A's rate is twice the difference between the two rates, B's rate = 6 tablets per hour, so that B-A = 6-4 = 2.
Time for B to catch up = w/(rate difference) = 30/2 = 15 hours.
Work produced by A in 15 hours = r*t = 4*15 = 60 tablets.
Since Machine A produces the same number of tablets in each case, SUFFICIENT.
Statement 2: The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.
Both Case 1 and Case 2 also satisfy statement 2.
Case 1: (B+A)/(B-A) = (3+2)/(3-2) = 5.
Case 2: (B+A)/(B-A) = (6+4)/(6-4) = 5.
Thus -- like statement 1 -- statement 2 is SUFFICIENT.
The correct answer is D.
An algebraic approach for Statement 1:
Let t = the time for B to catch up.
Work produced by A in t hours = At.
Since B = (3/2)A, work produced by B in t hours = Bt = (3/2)(At).
At the end of the t hours, A's work = B's work.
But BEFORE the t hours begin, A has already produced 30 tablets.
Implication:
During the t hours, A produces 30 fewer tablets than B.
Since A's work in t hours is equal to 30 less than B's work in t hours, we get:
At = (3/2)At - 30
30 = (1/2)(At)
60 = At.
Thus, the work produced by A in t hours = 60 tablets.
SUFFICIENT.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
GMAT/MBA Expert
- Jay@ManhattanReview
- GMAT Instructor
- Posts: 3008
- Joined: Mon Aug 22, 2016 6:19 am
- Location: Grand Central / New York
- Thanked: 470 times
- Followed by:34 members
Say when both the machine run together, machine A produces x numbers of tablets, while machine B produces (x + 30) numbers of tablets.rsarashi wrote:Machines A and B each produce tablets at their respective constant rates. Machine A has produced 30 tablets when Machine B is turned on. Both machines continue to run until Machine B's total production catches up to Machine A's total production. How many tablets does Machine A produce in the time that it takes Machine B to catch up?
(1) Machine A's rate is twice the difference between the rates of the two machines.
(2) The sum of Machine A's rate and Machine B's rate is five times the difference between the two rates.
OAD
Statement 1:
Say the rate of machine A is 'a' tablets per hour and that of machine B is 'b' tablets per hour.
Thus, a = 2(b - a)
=> a = 2b - 2a
= a = 2b/3
Thus, the time taken by machine A to produce x numbers of tablets = x/a;
and, the time taken by machine B to produce (x + 30) numbers of tablets = (x + 30)/b
Since the time is the same, we have,
x/a = (x + 30)/b
=> x/(2b/3) = (x + 30)/b;
=> 3x = 2x + 60
x = 60. Sufficient.
Statement 2:
We have,
a+b = 5(b-a)
=> a = 2b/3
This is the same information that we derived in Statement 1, thus this statement is also sufficient.
The correct answer: D
Hope this helps!
-Jay
Download free ebook: Manhattan Review GMAT Quantitative Question Bank Guide
________________
Manhattan Review GMAT Prep
Locations: New York | Jakarta | Nanjing | Berlin | and many more...
Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.