BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Linear agebra problem

Expert replies
by Mogorosi » Wed Dec 01, 2010 2:14 pm
the problem below keeps killing me; i want a methodical solution to it.

A company pays project contractors a rate of "a" dollars for the first hour and "b" dollars for each additional hour after the first, where a > b.

In a given month, a contractor worked on two different projects that lasted 2 and 4 hours, respectively. The company has the option to pay for each project individually or for all the projects at the end of the month. Which arrangement would be cheaper for the company and how much would the company save?

A. Per month, with savings of $(a + b)
B. Per month, with savings of $(a - b
C. The two options would cost an equal amount.
D. Per project, with savings of $(a + b
E. Per project, with savings of $(a - b)
Join the discussion
Source: — Problem Solving |

by trangle » Wed Dec 01, 2010 3:11 pm
We can pick numbers to solve this problem. Let's assume a=$2 and b=$1

If the company pays per month, it pays 6 hours total. We have (1hr*$2)+(5hr*$1)=$7

If the company pays each project individually:
The first project: (1hr*$2)+(1hr*$1)=$3
The second project: (1hr*$2)+(3hr*$1)=$5
So the company pays $3+$5=$8

We can clearly see that the company will save $1 (a-b) for paying per month. The correct answer is B.

What you do think?
Join the discussion

by N:Dure » Wed Dec 01, 2010 4:11 pm
trangle wrote:
We can pick numbers to solve this problem. Let's assume a=$2 and b=$1

If the company pays per month, it pays 6 hours total. We have (1hr*$2)+(5hr*$1)=$7
Notice here that there are two distinct projects, one lasting for 2 hrs and the other 4. So by plugging in the numbers, it should be:
1st project + 2nd project together = a (1st hour) +b (extra hour) + a +3b = 2a + 4b= 2($2) + 4($1) = $8

1st project alone: a+b = 3
2nd project: a+3b = 5

Total $8

So I think the answer is C. The two options would cost an equal amount.
Join the discussion

by Rahul@gurome » Thu Dec 02, 2010 12:20 am
Mogorosi wrote:A company pays project contractors a rate of "a" dollars for the first hour and "b" dollars for each additional hour after the first, where a > b. In a given month, a contractor worked on two different projects that lasted 2 and 4 hours, respectively. The company has the option to pay for each project individually or for all the projects at the end of the month. Which arrangement would be cheaper for the company and how much would the company save?

A. Per month, with savings of $(a + b)
B. Per month, with savings of $(a - b)
C. The two options would cost an equal amount.
D. Per project, with savings of $(a + b)
E. Per project, with savings of $(a - b)
If the company pays in per month basis,
  • Total number of work hours = (2 + 4) = 6
    Thus the company pays $(a + 5b)
If the company pays in per project basis,
  • For 1st project it pays $(a + b)
    For 2nd project it pays $(a + 3b)
    Total payment = $(a + b) + $(a + 3b) = $(2a + 4b)
Now, per project payment is greater than per project payment, because [(2a + 4b) - (a + 5b)] = (a - b), which is a positive quantity as a > b.

Thus per month payment is less and cheaper for the company with a savings equal to the difference of those payments, i.e. $(a - b)

The correct answer is B.
Rahul Lakhani
Quant Expert
Gurome, Inc.
https://www.GuroMe.com
On MBA sabbatical (at ISB) for 2011-12 - will stay active as time permits
1-800-566-4043 (USA)
+91-99201 32411 (India)
Join the discussion

by Rahul@gurome » Thu Dec 02, 2010 12:23 am
Mogorosi wrote:A company pays project contractors a rate of "a" dollars for the first hour and "b" dollars for each additional hour after the first, where a > b. In a given month, a contractor worked on two different projects that lasted 2 and 4 hours, respectively. The company has the option to pay for each project individually or for all the projects at the end of the month. Which arrangement would be cheaper for the company and how much would the company save?

A. Per month, with savings of $(a + b)
B. Per month, with savings of $(a - b)
C. The two options would cost an equal amount.
D. Per project, with savings of $(a + b)
E. Per project, with savings of $(a - b)
If the company pays in per month basis,
  • Total number of work hours = (2 + 4) = 6
    Thus the company pays $(a + 5b)
If the company pays in per project basis,
  • For 1st project it pays $(a + b)
    For 2nd project it pays $(a + 3b)
    Total payment = $(a + b) + $(a + 3b) = $(2a + 4b)
Now, per project payment is greater than per project payment, because [(2a + 4b) - (a + 5b)] = (a - b), which is a positive quantity as a > b.

Thus per month payment is less and cheaper for the company with a savings equal to the difference of those payments, i.e. $(a - b)

The correct answer is B.
Rahul Lakhani
Quant Expert
Gurome, Inc.
https://www.GuroMe.com
On MBA sabbatical (at ISB) for 2011-12 - will stay active as time permits
1-800-566-4043 (USA)
+91-99201 32411 (India)
Join the discussion

by Rahul@gurome » Thu Dec 02, 2010 5:49 am
Mogorosi wrote:Hold on a second, sir, I am still lost.

the formula here is a+b(x-1) where x is the total number of hours worked, right?

Project 1, with 2 hours yields a payment of a+b; and

Project 2, with 4 hours yields a payment of a+3b.

Please take it from here and show me how you treat individual payment vs combined payment at the end of the month. Thanks in advance.
Yes, that's correct.

Now if the company pay on per project basis, they pays $(a + b) for first project and then $(a + 3b) for the second project, a total of $(2a + 4b). Hope this is clear to you.


But when the company pays per month basis, it will just see how many hours a contractor has worked in that month. In this case which is (2 + 4) = 6 hours. Thus for the month the company will pay $a for the first hour and $b for the next 5 hour. In your words, for the month with 6 hours yields a payment of (a + 5b)

Thus two payments are different. Is that clear to you?
Which of them is smaller and smaller by what amount is already explained in the previous post.
Rahul Lakhani
Quant Expert
Gurome, Inc.
https://www.GuroMe.com
On MBA sabbatical (at ISB) for 2011-12 - will stay active as time permits
1-800-566-4043 (USA)
+91-99201 32411 (India)
Join the discussion