-
fangtray
- Master | Next Rank: 500 Posts
- Posts: 273
- Joined: Thu Sep 08, 2011 6:50 am
- Thanked: 5 times
- Followed by:3 members
Victor's job requires him to complete a series of identical jobs. If vitor is supervised at work, he finishes each job three days faster than if he is unsupervised. If Victor works for 144 days and is supervised for half the time, he will finish 36 jobs. How long would it take Victor to complete 10 jobs without any supervision?
can we set up the following equation? When i do it this way though, i can't get the right answer so i imagine you cant, but i cant figure out why the equation i set up wont work.
72r + 72(r-3) =36
rt = d
so 72 days at the regular rate plus 72 days at the rate shortened by 3 days should give us 36 jobs. apparently ..not?
can we set up the following equation? When i do it this way though, i can't get the right answer so i imagine you cant, but i cant figure out why the equation i set up wont work.
72r + 72(r-3) =36
rt = d
so 72 days at the regular rate plus 72 days at the rate shortened by 3 days should give us 36 jobs. apparently ..not?

















