BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

A foreman for an injection-molding firm

Expert replies
by manhhiep2509 » Sun Sep 21, 2014 7:21 am
A foreman for an injection-molding firm admits that
on 10% of his shifts, he forgets to shut off the injection
machine on his line. This causes the machine
to overheat, increasing the probability from 2%
to 20% that a defective molding will be produced
during the early morning run. What proportion of
moldings from the early morning run is defective?

A. 0.012
B. 0.027
C. 0.014
D. 0.038
E. 0.010

Answer: D
Join the discussion
Source: — Problem Solving |

by [email protected] » Sun Sep 21, 2014 10:52 am
Hi manhiep2509,

This question isn't quite worded the way that the Official GMAT would word it, and the math concept that it's based on isn't too common on the GMAT, but here's how you can solve it.

On any given day, we won't know if the foreman shut off the line or not, so we have to account for two situations:
1) Forgot to shut off the line (10% of the time) --> leads to a 20% chance of defects in the morning
2) DID NOT forget to shut off the line (the other 90% of the time) --> normal 2% chance of defects in the morning

1st option: (.1)(.2) = .02
2nd option: (.9)(.02) = .018
Total = .02 + .018 = .038

Final Answer: D

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Brent@GMATPrepNow » Sun Sep 21, 2014 11:06 am
manhhiep2509 wrote:A foreman for an injection-molding firm admits that on 10% of his shifts, he forgets to shut off the injection machine on his line. This causes the machine to overheat, increasing the probability from 2% to 20% that a defective molding will be produced during the early morning run. What proportion of moldings from the early morning run is defective?

A. 0.012
B. 0.027
C. 0.014
D. 0.038
E. 0.010

Answer: D
As Rich noted, this question isn't GMAT-quality.
Plus, as it stands, the correct answer is actually F. Cannot be determined, because we have no idea hom many moldings were produced during the early morning run.
For example, if only 2 moldings were produced, then there could be only 3 correct answers: 0/2, 1/2 or 2/2, in which case none of the answer choices match.

That said, the (poorly-worded) INTENT of the question is to determine the EXPECTED proportion of defects. In that case Rich's solution is perfect.


Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Matt@VeritasPrep » Mon Sep 22, 2014 9:10 am
This question is pretty easily fixed by changing "proportion" to "expected proportion" and by stipulating that the foreman is present during every early morning run in which moldings are made. Over time, we'd expect 3.8% of the moldings to be defective: 2% of the 90% made on mindful days plus 20% of the 10% made on forgetful days.
Join the discussion