BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Pool

Expert replies
by crackgmat007 » Sat Nov 07, 2009 4:04 pm
A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened?

at 2:00 pm
at 2:30 pm
at 3:00 pm
at 3:30 pm
at 4:00 pm

OA - D
Join the discussion
Source: — Problem Solving |

Re: Pool

by Testluv » Sat Nov 07, 2009 5:34 pm
crackgmat007 wrote:A pool can be filled in 4 hours and drained in 5 hours. The valve that fills the pool was opened at 1:00 pm and some time later the drain that empties the pool was also opened. If the pool was filled by 11:00 pm and not earlier, when was the drain opened?

at 2:00 pm
at 2:30 pm
at 3:00 pm
at 3:30 pm
at 4:00 pm

OA - D
Hi crackgmat007,

The valve that fills the pool pumps water into the pool at a rate of 1/4 pool per hour. The valve that drains the pool drains it at a rate of 1/5 pool per hour. When both valves are on, the rate at which the pool fills will be the difference between these two rates: 1/4 - 1/5 = 1/20 pool per hour.

We know that the pool was filled in ten hours, and that the "pump-in" valve was on for some time before the drain valve got turned on. The time that only the pump-in valve was on, we can call "x".

So, for x hours the pool was being filled up at a rate of 1/4 pool per hour. And then, for 10-x hours, the pool was being filled up at a rate of 1/20 pool per hour. And in ten hours, exactly one pool got filled:

x/4 + (10-x)/20 = 1 pool
x = 2.5 hours

So the pump-in valve was on for 2.5 hours by itself.

Choose D.

Note that backsolving, using the answer choices with a little bit of algebra would likely have been more efficient than pure algebra.
Kaplan Teacher in Toronto
Join the discussion

by rahul.s » Sat Jan 30, 2010 10:06 am
amazing explanation. thanks :)
Join the discussion