-
HPengineer
- Master | Next Rank: 500 Posts
- Posts: 165
- Joined: Wed Mar 24, 2010 8:02 am
- Thanked: 2 times
- Followed by:1 members
Working this problem i got stuck trying to use a smart number. Any thoughts how to complete it using a smart number for the widgets?
OG quant review #173
Running at their respective constant rates, Machine X takes 2 days longer to produce W widgets than machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take to produce 2w widgets?
Thanks in advance!!
OG quant review #173
Running at their respective constant rates, Machine X takes 2 days longer to produce W widgets than machine Y. At these rates, if the two machines together produce 5/4w widgets in 3 days, how many days would it take to produce 2w widgets?
Thanks in advance!!












