BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Work problem

Expert replies
by umaa » Thu Dec 03, 2009 10:36 pm
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

(100xy - z)/ (x + y)



y(100x - z) / (x + y)




100y(x - z) /(x + y)



x + y /(100xy - z)



x + y - z / (100xy)

OA is B
What we think, we become
Join the discussion
Source: — Problem Solving |

by papgust » Thu Dec 03, 2009 10:59 pm
A takes z hours to manufacture alone. So, its z/x decks

Remaining work to be done by both A and B is (100 - z/x) decks

Together, A and B takes (x+y)/xy hours to manufacture 1 deck. Hence, to manufacture (100 - z/x) decks,

(100 - z/x) * xy/(x+y)

which is nothing but,

y*(100x - z)/(x + y)
Join the discussion

by mehravikas » Mon Jan 25, 2010 2:49 pm
Awesome explanation.
papgust wrote:A takes z hours to manufacture alone. So, its z/x decks

Remaining work to be done by both A and B is (100 - z/x) decks

Together, A and B takes (x+y)/xy hours to manufacture 1 deck. Hence, to manufacture (100 - z/x) decks,

(100 - z/x) * xy/(x+y)

which is nothing but,

y*(100x - z)/(x + y)
Join the discussion

by mcdesty » Sat Jul 12, 2014 2:50 pm
Here is how I would organize this on my scratch paper. Stay organized and don't fear the algebra.
Attachments
Rates 8.jpg
Last edited by mcdesty on Sun Jul 13, 2014 9:30 pm, edited 1 time in total.
I have made your mistakes before.
I am experienced - I have tutored calculus and linear algebra for over two years.
For a very modest fee, I will ensure that your GMAT journey is a smooth one: Daily assignments and careful micro management.
PM me so we can get started.
Join the discussion

by [email protected] » Sat Jul 12, 2014 4:58 pm
Hi mcdesty et al.,

Since this post was last "active" over 4 years ago, my guess is that the original users are no longer on the site.

However, for anyone new who might be interested in a strategic approach to this question, it's actually perfect for TESTing VALUES. Here's how:

Machine A takes X hours to make a deck of cards.
Machine B takes Y hours to make a deck of cards.

Since the answers are suitably complex-looking, let's choose really small, easy numbers to work with:

X = 1
Y = 2

So...
Machine A takes 1 hour to make a deck of cards
Machine B takes 2 hours to make a deck of cards
When both machines work together for 2 total hours, 3 decks of cards are made.

The question goes on to state that Machine A will work alone for Z hours, then be joined by Machine B until 100 decks are made.

Z = 1

In that first hour, Machine A will produce 1 deck of cards, leaving 99 decks to go. Since the two machines together can produce 3 decks every 2 hours, the remaining 99 decks will take...
2 hours x 33 sets = 66 hours.

We're looking for the answer that equals 66 when we plug in X=1, Y=2 and Z=1 into the answer choices.

While it "looks like" there's a lot of math to be done, most of the answers are way too small to be 66 (and it shouldn't take too long to figure that out). Only one answer equals 66

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by GMATGuruNY » Sat Jul 12, 2014 7:42 pm
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

a) (100xy - z)/(x+y)
b) y(100x - z)/(x+y)
c) (x+y)/(100xy - z)
d) xz(100y - z)/(x+y+z)
e) (x+y-z)/(100xy)
Let x = 1 hour.
Since A takes 1 hour to produce a deck, A's rate = 1 deck per hour.
Let y = 2 hours.

Let A complete the ENTIRE JOB.
Since A produces 1 deck per hour, the time for A to produce all 100 decks = 100 hours.
Thus, z=100.

The question stem asks for the time that A and B work together.
Since A completes the entire job, the number of hours that A and B work together = 0. This is our target.

Now plug x=1, y=2 and z=100 into the answers to see which yields our target of 0.
A quick scan reveals that only B works:
y(100x - z)/(x+y) = 2(100*1 - 100)/(1+2) = 0.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by GMATinsight » Sun Jul 13, 2014 12:05 am
It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

a) (100xy - z)/(x+y)
b) y(100x - z)/(x+y)
c) (x+y)/(100xy - z)
d) xz(100y - z)/(x+y+z)
e) (x+y-z)/(100xy)
A's 1 hour work = 1/X
B's 1 hour work = 1/Y
1 Hour work of both A and B together = (1/X)+(1/Y) = (X+Y)/XY

A's Z hour work = Z/X
B's T hour work = T/Y [T is the assumed time that B worked with A i.e. both A and B worked Simultaneously]

The total work done by A and B together in T hours = T*(X+Y)/XY

Total work = (Z/X)+{T*(X+Y)/XY} = {ZY+T(X+Y)}/(XY) = 100 Decks

T = (100XY-ZY)/(X+Y) = Y(100X-Z)/(X+Y)

Answer: Option B
"GMATinsight"Bhoopendra Singh & Sushma Jha
Most Comprehensive and Affordable Video Course 2000+ CONCEPT Videos and Video Solutions
Whatsapp/Mobile: +91-9999687183 l [email protected]
Contact for One-on-One FREE ONLINE DEMO Class Call/e-mail
Most Efficient and affordable One-On-One Private tutoring fee - US$40-50 per hour
Join the discussion

by Scott@TargetTestPrep » Fri Dec 15, 2017 10:35 am
umaa wrote:It takes machine A x hours to manufacture a deck of cards that machine B can manufacture in y hours. If machine A operates alone for z hours and is then joined by machine B until 100 decks are finished, for how long will the two machines operate simultaneously?

A. (100xy - z)/(x + y)
B. y(100x - z)/(x + y)
C. 100y(x - z)/(x + y)
D. (x + y)/(100xy - z)
E. (x + y - z)/100xy
We can let the rate of machine A = 1/x and the rate of machine B = 1/y. We are given that machine A operates for z hours, so machine A completes (1/x)(z) = z/x decks of cards when operating alone. Thus, there will be 100 - z/x decks left to complete when machines A and B work together.

We can let n = the number of hours that machines A and B work together to complete (100 - z/x) decks and we can create the following equation:

(1/x + 1/y)(n) = 100 - z/x

Multiplying the entire equation by xy, we have:

(y + x)(n) = 100xy - zy

n = y(100x - z)/(y + x)

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion