-
gmatdriller
- Master | Next Rank: 500 Posts
- Posts: 418
- Joined: Sun Jul 04, 2010 12:48 pm
- Thanked: 6 times
- Followed by:3 members
A qualified worker digs a well in 5 hours. He invites 2 apprentices, both capable of working 3/4 as fast and 2 trainees both working 1/5 as fast as he. If the five-person team digs the same well, how much time does the team need to finish the job?
A. 1:24
B. 1:34
C. 1:44
D. 1:54
E. 2:14
OA is C
My analysis:
The Qualified worker takes 5hrs;
2 Appr work at 3/4 as fast as the Qualified worker;
I think both Appr would take 5/(3/4)hrs right?
e.g if Q takes 5hrs and I say, W works twice as fast as the rate of Q.
Then W takes 5/2 = 2.5hrs?
Pls correct my analysis.
Source: Gmatclub
A. 1:24
B. 1:34
C. 1:44
D. 1:54
E. 2:14
OA is C
My analysis:
The Qualified worker takes 5hrs;
2 Appr work at 3/4 as fast as the Qualified worker;
I think both Appr would take 5/(3/4)hrs right?
e.g if Q takes 5hrs and I say, W works twice as fast as the rate of Q.
Then W takes 5/2 = 2.5hrs?
Pls correct my analysis.
Source: Gmatclub


















