Rate/Work Problem 1

This topic has expert replies
User avatar
Legendary Member
Posts: 504
Joined: Tue Apr 19, 2011 1:40 pm
Thanked: 114 times
Followed by:11 members

Rate/Work Problem 1

by knight247 » Thu Mar 14, 2013 11:41 pm
It takes six days for three women and two men working together to complete a piece of work. Three men would do the same work five day sooner than nine women. By how many times does the output of a man exceed that of a woman?

(A) 3 times
(B) 4 times
(C) 5 times
(D) 6 times
(E) 7 times

OA - D

I would appreciate a direct solution to this problem using equations only, as I've already figured out the backdoor method to solving this problem.
Last edited by knight247 on Fri Mar 15, 2013 2:27 am, edited 2 times in total.
Source: — Problem Solving |

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 511
Joined: Wed Aug 11, 2010 9:47 am
Location: Delhi, India
Thanked: 344 times
Followed by:86 members

by Anju@Gurome » Fri Mar 15, 2013 12:59 am
knight247 wrote:It takes six days for three women and two men working together to complete a piece of work. Three men would do the same work five day sooner than nine women. How many days does the output of a man exceed that of a woman?
That's a very bad wording. I'm not sure what does that mean.

Let us assume that it takes M and W days for a man and a woman to complete the job individually, respectively. Hence, in one day, a man does 1/M of the work and a woman does 1/W of the work.

Hence, 6*(2/M + 3/W) = 1
And (W/9 - M/3) = 5 ---> (W/3 - M) = 15 ---> W/3 = (15 + M) ---> 3/W = 1/(15 + M)

So, 6*(2/M + 1/(15 + M)) = 1
--> 6*[(30 + 2M + M)/(M*(15 + M)] = 1
--> 6*(30 + 3M) = M*(15 + M)
--> 180 + 18M = 15M + M²
--> M² - 3M - 180 = 0
--> M² - 15M + 12M - 12*15 = 0
--> (M - 15)(M + 12) = 0

As M cannot be negative, M = 15

Now, W = 3*(15 + M) = 3*(M + M) = 6M

This means a woman take 6 times as much days as a man take to finish the work, i.e. a woman take 5 times more days than what a man take to finish the work.
Anju Agarwal
Quant Expert, Gurome

Backup Methods : General guide on plugging, estimation etc.
Wavy Curve Method : Solving complex inequalities in a matter of seconds.

§ GMAT with Gurome § Admissions with Gurome § Career Advising with Gurome §

User avatar
Legendary Member
Posts: 504
Joined: Tue Apr 19, 2011 1:40 pm
Thanked: 114 times
Followed by:11 members

by knight247 » Fri Mar 15, 2013 2:27 am
Thanks a ton, Anju. I just edited my post. There was the type-o. My exact question was: By how many TIMES does the output of a man exceed that of a woman?

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Fri Mar 15, 2013 7:00 am
knight247 wrote:It takes six days for three women and two men working together to complete a piece of work. Three men would do the same work five day sooner than nine women. By how many times does the output of a man exceed that of a woman?

(A) 3 times
(B) 4 times
(C) 5 times
(D) 6 times
(E) 7 times

OA - D
I think it would be easier to plug in the answer choices.

Answer choice C: rate for each man = 5 times the rate for each woman
Let the rate for each woman = 1 unit per day and the rate for each man = 5 units per day.
Thus, the combined rate for 3 women and 2 men = 3*1 + 2*5 = 13 units per day.
In 6 days, the amount of work produced = 6*13 = 78 units.
Since the rate for 9 women = 9*1 = 9 units per day, the time for 9 women to complete 78 units = 78/9 = 8+ days.
Since the rate for 3 men = 3*5 = 15 units per day, the time for 3 men to complete 78 units = 78/15 = 5+ days.
Here, the men finish about 3 days sooner than the women.
Since the men must finish 5 days sooner than the women, the men must work FASTER.

Answer choice D: rate for each man = 6 times the rate for each woman
Let the rate for each woman = 1 unit per day and the rate for each man = 6 units per day.
Thus, the combined rate for 3 women and 2 men = 3*1 + 2*6 = 15 units per day.
In 6 days, the amount of work produced = 6*15 = 90 units.
Since the rate for 9 women = 9*1 = 9 units per day, the time for 9 women to complete 90 units = 90/9 = 10 days.
Since the rate for 3 men = 3*6 = 18 units per day, the time for 3 men to complete 90 units = 90/18 = 5 days.
Here, the men finish 5 days sooner than the women.
Success!

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3