by SaraLotfy » Wed Oct 02, 2013 8:50 am
Adam and Brianna plan to install a new tile floor in a classroom. Adam works at a constant rate of 50 tiles per hour, and Brianna works at a constant rate of 55 tiles per hour. If the new floor consists of exactly 1400 tiles, how long will it take Adam and Brianna working together to complete the tile floor?

A)26hrs 44mins
B)13hrs 18mins
C)26hrs 40mins
D)12hrs 45mins
E)13hrs 20mins
Join the discussion
Source: — Problem Solving |

by theCodeToGMAT » Wed Oct 02, 2013 8:56 am
1400 = 50(T) + 55(T)

1400 = 105(T)

T = 1400/105 = 13.33 => 13 hrs 20 min

Answer [spoiler]{E}[/spoiler]

What it the OA?
R A H U L
Join the discussion

by mevicks » Wed Oct 02, 2013 9:01 am
A --> 50 Tiles in 60 Mins
B --> 55 Tiles in 60 Mins

Together both A & B in 60 mins --> 105 Tiles

60 --> 105
x --> 1400

Cross Multiply
x = (60 * 1400) / 105 = 800 Mins = 13(1/3) Hrs = 13 (1/3 * 60)

[spoiler]Answer E: 13 Hrs 20 Mins[/spoiler]

Regards,
Vivek
Join the discussion

by SaraLotfy » Wed Oct 02, 2013 9:26 am
Yup its E
Join the discussion

by ganeshrkamath » Wed Oct 02, 2013 11:50 pm
SaraLotfy wrote:Adam and Brianna plan to install a new tile floor in a classroom. Adam works at a constant rate of 50 tiles per hour, and Brianna works at a constant rate of 55 tiles per hour. If the new floor consists of exactly 1400 tiles, how long will it take Adam and Brianna working together to complete the tile floor?

A)26hrs 44mins
B)13hrs 18mins
C)26hrs 40mins
D)12hrs 45mins
E)13hrs 20mins
Working together, they can lay 105 tiles an hour.
Number of hours required to lay 1400 tiles = 1400/105
= 280/21
= 40/3
= 13 1/3
= 13 hours 20 minutes

Choose E

Cheers
Every job is a self-portrait of the person who did it. Autograph your work with excellence.

Kelley School of Business (Class of 2016)
GMAT Score: 750 V40 Q51 AWA 5 IR 8
https://www.beatthegmat.com/first-attemp ... tml#688494
Join the discussion

hi

by Jeff@TargetTestPrep » Thu Dec 14, 2017 5:43 pm
SaraLotfy wrote:Adam and Brianna plan to install a new tile floor in a classroom. Adam works at a constant rate of 50 tiles per hour, and Brianna works at a constant rate of 55 tiles per hour. If the new floor consists of exactly 1400 tiles, how long will it take Adam and Brianna working together to complete the tile floor?

A)26hrs 44mins
B)13hrs 18mins
C)26hrs 40mins
D)12hrs 45mins
E)13hrs 20mins
Since Adam works at a constant rate of 50 tiles per hour and Brianna works at a constant rate of 55 tiles per hour, their combined rate is 105 tiles per hour.

If we let t = the time they work together, we have:

105t = 1400

t = 1400/105 = 280/21 = 13 7/21 = 13 1/3 hours = 13 hours 20 mins.

Answer: E

Jeffrey Miller
Head of GMAT Instruction