BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach Starts Oct 17
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE CLASSES

Get Ready for GMAT Test Day Faster with Live Online Classes

with Chris Peckover, 100th-Percentile GMAT Scorer

Oct 17 · Chris Peckover
Sat · 11:00 AM to 2:00 PM ET
Oct 20 · Chris Peckover
Tue, Thu · 8:00 to 10:00 PM ET
Oct 25 · Josh Braslow
Sun · 1:00 to 4:00 PM ET
Included
40 hours of live online classes + 6 months of TTP OnDemand
  • Attend the first class for free
  • Every class is recorded, so you never fall behind
View classes & enroll
Limited seats availableTarget Test Prep
EALiveTeachOnDemand 5 seats left Start anytime
EXECUTIVE ASSESSMENT

Target Test Prep EA OnDemand

Self-paced EA prep. Study on your schedule.

Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

165+ EA score guarantee
$05-day trial no automatic billing
Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll Start free 5-day trial
Limited cohort · enrollment openTrial includes full course accessTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

machines R and S

Expert replies
by josh80 » Sun Dec 15, 2013 3:26 pm
A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

3
4
6
9
12

OA 6
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Sun Dec 15, 2013 3:49 pm
josh80 wrote:A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

3
4
6
9
12

OA 6
One approach is to assign a "nice" value to the job.
Say, the job is to make 36 widgets.

R does a certain job in 36 hours
This means that machine R's rate is 1 widget/hour

S does the job in 18 hours
This means that machine S's rate is 2 widgets/hour

So, their combined rate is 3 widgets/hour.


The question asks us to complete the job in 2 hours.
To make 36 widgets in 2 hours, the combined rate of the two machines must be 18 widgets/per hour.
If the combined rate (of 1 R machine and 1 S machine) is 3 widgets/hour, then we'd need 6 of each machine to reach a rate of 18 widgets/hour.

So, the answer is 6

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by Brent@GMATPrepNow » Sun Dec 15, 2013 3:50 pm
josh80 wrote:A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

3
4
6
9
12

OA 6
Here's another approach . . .

When it comes to questions where we must complete an entire job, I often (not always) like to know what can be accomplished in 1 unit of time (in this case, 1 hour).

Machine R can complete 1/36 of the job in 1 hour.
Machine S can complete 1/18 of the job in 1 hour.
Since 1/36 + 1/18 = 1/12, we know that, combined, machines R and S can complete 1/12 of the job in 1 hour.

From here we can apply some logic.
If 1/12 of the job is completed in 1 hour (with 1 R machine and 1 S machine), then we could complete the entire job in 1 hour if we had 12 of each machine type.
However, the question asks us to find the # of machines required to complete the job in 2 hours. So, we need half as many machines. In other words, we need 6 of each machine.

Answer = 6

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by josh80 » Mon Dec 16, 2013 12:56 pm
Thank you for the solutions Brent. I always seems to struggle with Rate & Work questions. Do you have any suggestions on how to overcome this conceptually?
Join the discussion

by Brent@GMATPrepNow » Mon Dec 16, 2013 1:02 pm
josh80 wrote:Thank you for the solutions Brent. I always seems to struggle with Rate & Work questions. Do you have any suggestions on how to overcome this conceptually?
These kinds of questions are pretty tricky.
In my opinion, the two tips I gave are the most important:

1) For questions in which we must complete an entire job, it's often useful to determine what can be accomplished in 1 unit of time (1 hour, 1 day, etc).

2) You should also consider assigning a "nice" value to the job. For example, you may say that an entire job consists of making 48 widgets.

You should also keep the following rules in your back pocket:

Rule #1: If a person can complete an entire job in k hours, then in one hour, the person can complete 1/k of the job
Example: If it takes Sue 5 hours to complete a job, then in one hour, she can complete 1/5 of the job. In other words, her work rate is 1/5 of the job per hour

Rule #2: If a person completes a/b of the job in one hour, then it will take b/a hours to complete the entire job
Example: If Sam can complete 1/8 of the job in one hour, then it will take him 8/1 hours to complete the job.
Likewise, if Joe can complete 2/3 of the job in one hour, then it will take him 3/2 hours to complete the job.

I hope that helps.

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by josh80 » Fri Dec 20, 2013 11:51 am
Brent@GMATPrepNow wrote:
josh80 wrote:Thank you for the solutions Brent. I always seems to struggle with Rate & Work questions. Do you have any suggestions on how to overcome this conceptually?
These kinds of questions are pretty tricky.
In my opinion, the two tips I gave are the most important:

1) For questions in which we must complete an entire job, it's often useful to determine what can be accomplished in 1 unit of time (1 hour, 1 day, etc).

2) You should also consider assigning a "nice" value to the job. For example, you may say that an entire job consists of making 48 widgets.

You should also keep the following rules in your back pocket:

Rule #1: If a person can complete an entire job in k hours, then in one hour, the person can complete 1/k of the job
Example: If it takes Sue 5 hours to complete a job, then in one hour, she can complete 1/5 of the job. In other words, her work rate is 1/5 of the job per hour

Rule #2: If a person completes a/b of the job in one hour, then it will take b/a hours to complete the entire job
Example: If Sam can complete 1/8 of the job in one hour, then it will take him 8/1 hours to complete the job.
Likewise, if Joe can complete 2/3 of the job in one hour, then it will take him 3/2 hours to complete the job.

I hope that helps.

Cheers,
Brent
Thank you Brent. Your suggestions above have helped a lot.
Join the discussion

by Jeff@TargetTestPrep » Thu Dec 07, 2017 6:32 am
josh80 wrote:A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?

3
4
6
9
12
We have a combined worker problem for which we can use the following formula:

work (1 machine) + work (2 machine) = total work completed

Since we are completing one job, we can say:

work (1 machine) + work (2 machine) = 1

We are given that a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours.

Thus, the rates for the two machines are as follows:

rate of machine R = 1/36

rate of machine S = 1/18

We are also given that the company used the same number of each type of machine to do the job in 2 hours. If we let x = the number of each machine used, we can multiply each rate by x and we have:

rate of x number of R machines = x/36

rate of x number of S machines = x/18

Finally, since we know some number of R and S machines worked for two hours, and since work = rate x time, we can calculate the work done by each type of machine.

work done by x number of R machines = 2x/36 = x/18

work done by x number of S machines = 2x/18 = x/9

Now we can determine x using the combined worker formula:

work (machine R) + work (machine S) = 1

x/18 + x/9 = 1

x/18 + 2x/18 = 1

3x/18 = 1

x/6 = 1

x = 6

Answer: C

Jeffrey Miller
Head of GMAT Instruction
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews
Join the discussion