If the machine produces 40 in 8 minutes, this means the machine produces 5 per minute. 40/8=5. to calculate the amount per hour multiply by 60 minutes. 300/hr D
Work/Rate Problems
This topic has expert replies
Source: Beat The GMAT — Problem Solving |
GMAT/MBA Expert
- Brent@GMATPrepNow
- GMAT Instructor
- Posts: 16207
- Joined: Mon Dec 08, 2008 6:26 pm
- Location: Vancouver, BC
- Thanked: 5254 times
- Followed by:1268 members
- GMAT Score:770
Given: Machine X can make 40 widgets in 8 minutes
This means that: Machine X can make 80 widgets in 16 minutes [ double the time, double the output]
Likewise if we multiply the original information by 7 we get: Machine X can make 280 widgets in 56 minutes
If we multiply the original information by 0.5 we get: Machine X can make 20 widgets in 4 minutes
When we ADD these two results, we get: Machine X can make 300 widgets in 60 minutes
Answer: D
Cheers,
Brent
GMAT/MBA Expert
- Scott@TargetTestPrep
- GMAT Instructor
- Posts: 8086
- Joined: Sat Apr 25, 2015 10:56 am
- Location: Los Angeles, CA
- Thanked: 43 times
- Followed by:29 members
Solution:
Since 1 hour is 60 minutes, Machine X can make 40/8 x 60 = 5 x 60 = 300 widgets.
Alternate solution:
We can set up a proportion in which x is the number of widgets that can be made in 1 hour, or 60 minutes:
40/8 = x/60
5 = x/60
300 = x
Answer: D
Scott Woodbury-Stewart
Founder and CEO
[email protected]

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews