- Anaira Mitch
- Master | Next Rank: 500 Posts
- Posts: 235
- Joined: Wed Oct 26, 2016 9:21 pm
- Thanked: 3 times
- Followed by:5 members
Hose A takes 2 days to fill a pool, hose B takes 3 days to fill a pool, and hose C takes 6 days to fill a pool. All three hoses are used to fill the first one-third of the pool, at which time hose B stops working and hose A and hose C continue until it is two-thirds full. At that point, hose C stops working and hose A continues until the pool is full. How long did it take to fill the entire pool?
a) 1.5
b) 2.5
c) 3.5
d) 4.5
e) 1.2
a) 1.5
b) 2.5
c) 3.5
d) 4.5
e) 1.2















