BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
Vote for Target Test Prep, Newsweek Readers’ Choice Awards 2026
NEWSWEEK READERS’ CHOICE 2026

BIG NEWS! Target Test Prep has been nominated, and they’d love your vote!

TTP has worked incredibly hard to build the best test prep experience possible, and winning Newsweek’s 2026 Readers’ Choice Award for Best Test Prep would mean a lot to them. If TTP has helped you, they’d be incredibly grateful for your vote. You can vote once each day through September 9.

Vote for TTP
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

The total cost of producing item X....

Expert replies
by factor26 » Sun Sep 18, 2011 3:02 pm
The total cost of producing item X is equal to the sum of item X's overhead cost and production cost. If the production cost of producing X decreased by 5% in January, by what percent did the total cost of producing item X change in that same month?

(1) The overhead cost of producing item X increased by 13% in January.

(2) Before the changes in January, the overhead cost of producing item X was 5 times the production cost of producing item X.

ANSWER IS C BUT CAN SOMEONE PLEASE EXPLAIN IN MORE DETAIL?
Join the discussion
Source: — Problem Solving |

by cans » Sun Sep 18, 2011 9:36 pm
X = o + p.
x' = o + .95p
A) x'' = 1.13o + .95p
Insufficient as we can't find actual percent
B) o=5p.
thus X = 6p. but we don't know by how much o increases.
A&B) o=5p.
x=6p
o' = 1.13*5p.5.65p
p' = .95p
thus x' = 5.65p + .95p = 6.6p
Thus we can find % change
IMO C
If my post helped you- let me know by pushing the thanks button ;)

Contact me about long distance tutoring!
[email protected]

Cans!!
Join the discussion

by GMATGuruNY » Mon Sep 19, 2011 12:32 pm
The total cost of producing item X is equal to the sum of item X's overhead cost and production cost. If the production cost of producing X decreased by 5% in January, by what percent did the total cost of producing item X change in that same month?

(1) The overhead cost of producing item X increased by 13% in January.

(2) Before the changes in January, the overhead cost of producing item X was 5 times the production cost of producing item X.
To determine the percent change in the total cost, we need to know the RATIO between the new cost and the original cost.
Question rephrased: What is the value of (new cost)/(original cost)?

Statement 1: The overhead cost of producing item X increased by 13% in January.
Test one case that also satisfies statement 2 and one case that DOESN'T also satisfy statement 2.

Case 1:
Original overhead cost = 100, original production cost = 20, original total cost = 100+20 = 120.
13% higher overhead cost = 113, 5% lower production cost = 19, new total cost = 113+19 = 132.
Resulting ratio:
(new cost)/(original cost) = 132/120 = 11/10.

Case 2:
Original overhead cost = 100, original production cost = 40, original total cost = 100+40 = 140.
13% higher overhead cost = 113, 5% lower production cost = 38, new total cost = 113+38 = 151.
Resulting ratio:
(new cost)/(original cost) = 151/140.

Since different ratios are possible, INSUFFICIENT.

Statement 2: Before the changes in January, the overhead cost of producing item X was 5 times the production cost of producing item X.
No information about how the overhead cost changes in January.
INSUFFICIENT.

Statements combined:
Case 1 satisfies both statements.
Test one more case that satisfies both statements.

Case 3:
Original overhead cost = 200, original production cost = 40, original total cost = 200+40 = 240.
13% higher overhead cost = 226, 5% lower production cost = 38, new total cost = 226+38 = 264.
Resulting ratio:
(new cost)/(original cost) = 264/240 = 11/10.

Since Case 1 and Case 3 yield the same ratio, the two statements combined indicate that (new cost)/(original cost) = 11/10.
SUFFICIENT.

The correct answer is C.
Last edited by GMATGuruNY on Fri Mar 04, 2016 3:48 pm, edited 1 time in total.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by ashutoshkumar7 » Mon Sep 19, 2011 1:43 pm
Why not B itself sufficient? Is it because we also need to know if the over head price increased or decreased or remain same?
Thanks,
Ashutosh
Join the discussion

by GMATGuruNY » Mon Sep 19, 2011 1:48 pm
ashutoshkumar7 wrote:Why not B itself sufficient? Is it because we also need to know if the over head price increased or decreased or remain same?
Correct! With statement 2, we know the initial ratio of production cost to overhead cost and the percent increase in the production cost, but we don't know by what percentage the overhead cost changed.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion