BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATLiveTeach 7 seats left
Chris Peckover
NEXT LIVE COHORT

Oct 13 to Jan 7, 2027

with Chris Peckover

Schedule
Tue, Thu · 8:00 to 10:00 PM ET
Included
40 live hours + 6 months of GMAT OnDemand
  • Live instruction and real-time questions
  • Class recordings and assigned practice
View class & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Two machines

Expert replies
by dbowden » Tue Dec 04, 2012 12:47 pm
Hi,

Can someone help me solve this question?

Working alone at its own constant rate, a machine seals n cartons in 8 hours, and working alone at its own constant rate, a second machine seals n cartons in 4 hours. If the two machines, each working at its own constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

(A) 25%
(B) 33 1/3%
(C) 50%
(D) 66 2/3%
(E) 75%
Join the discussion
Source: — Problem Solving |

by Brent@GMATPrepNow » Tue Dec 04, 2012 12:51 pm
dbowden wrote:Hi,

Can someone help me solve this question?

Working alone at its own constant rate, a machine seals n cartons in 8 hours, and working alone at its own constant rate, a second machine seals n cartons in 4 hours. If the two machines, each working at its own constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

(A) 25%
(B) 33 1/3%
(C) 50%
(D) 66 2/3%
(E) 75%
One option is to plug in a convenient value for n.

Let's say that n=8.
So, the slower machine seals 8 cartons in 8 hours, which means it seals 1 carton per hour.
This also means that the faster machine seals 8 cartons in 4 hours, which means it seals 2 carton per hour.

Now the question considers a scenario in which the 2 machines, working together, and for the same period of time, sealed a certain number of cartons.

Well, let's say they worked for one hour.
This means they sealed a total of 3 cartons, and the faster machine sealed 2 of those cartons.
So, the faster machine sealed 2/3 ([spoiler]or 66 2/3%[/spoiler]) of the cartons.

So, the answer is D

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image
Join the discussion

by mcressy » Tue Dec 04, 2012 12:56 pm
Hi,

The best approach to this problem is to think about is to think about the two machines' relative rates. The first machine can complete 1/8 of the task in an hour (if it takes 8 hours to do the job, then the machine can get 1/8 done in one hour), and the second machine can complete ¼ (or 2/8) of the task in the same hour (similar logic as above). We can then combine 2/8+1/8 and figure out that in a single hour, the two machines can get 3/8 of the job done.

So, if the machines together get 3/8 of the job done in an hour, and the second machine accomplishes 2/8 of the job, and the first machine accomplishes 1/8 of the job, then machine b represents 2/3 of the total work done (2/8 divided by 3/8 = 2/3, or 66 2/3%.)


Alternatively, you could consider it from the aspect of getting the jobs done. If both machines work for 8 hours, how many times would the task get done? The answer is 3, the first machine could do it once in 8 hours, the second machine could do it twice in 8 hours (four hours for the first, four more for the second). So if a task the size n could get done 3 times in eight hours, and the second machine does 2 of those 3 times, then the answer is 2/3 (66 2/3%)

Correct answer is D.
Join the discussion

by GMATGuruNY » Tue Dec 04, 2012 6:02 pm
dbowden wrote:Hi,

Can someone help me solve this question?

Working alone at its own constant rate, a machine seals n cartons in 8 hours, and working alone at its own constant rate, a second machine seals n cartons in 4 hours. If the two machines, each working at its own constant rate and for the same period of time, together sealed a certain number of cartons, what percent of the cartons were sealed by the machine working at the faster rate?

(A) 25%
(B) 33 1/3%
(C) 50%
(D) 66 2/3%
(E) 75%
Time and rate are RECIPROCALS.
The TIME RATIO for the two machines = slower time : faster time = 8:4.
Thus, the RATE RATIO for the two machines = slower rate : faster rate = 4:8.
Implication: for every 4 cartons sealed by the slower machine, the faster machine seals 8 cartons.
Thus, of every 12 cartons, 8 are sealed by the faster machine:
8/12 = 2/3 = 66 2/3 %.

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion