BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 21
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

Sep 21 to Oct 9, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

Ratio of Radio production

Expert replies
by r_walid » Thu Nov 05, 2009 9:37 am
A company produces two types of radio: basic and deluxe.
of the stereos produced, 2/3 are basc and the rest delux.
if it takes 7/5 as many hours to produce a deluxe as it does to produce a basic, then what is the ratio of the number of hours it took to produce deluxe radio over the total hours it took to produce all radios?

7/17
14/31
7/15
17/35
1/2
Join the discussion
Source: — Problem Solving |

Re: Ratio of Radio production

by life is a test » Fri Nov 06, 2009 11:01 pm
r_walid wrote:A company produces two types of radio: basic and deluxe.
of the stereos produced, 2/3 are basc and the rest delux.
if it takes 7/5 as many hours to produce a deluxe as it does to produce a basic, then what is the ratio of the number of hours it took to produce deluxe radio over the total hours it took to produce all radios?

7/17
14/31
7/15
17/35
1/2
IMO A

picked total number of radios as 60 -> delux =20 and basic = 40.

hrs it takes to produce delux = time to produce one delux radio * number of delux radios = 7/5 * 20 = 28

total hrs = 28 + 1*40 = 68

delux hrs / total hrs = 28/68 = 7/17.

OA pls.
Join the discussion

by grockit_jake » Fri Nov 13, 2009 2:45 pm
I agree -- it helps here to just pick arbitrary (small and relevant) numbers that work with the fractions given:

Total radios should equal a multiple of 3:

2 basic
1 deluxe

Hrs to produce deluxe is 7/5 hrs to produce basic, so:

Time for basic = 5 hrs
Time for deluxe = 7 hrs

Total time for basics = 2*5 = 10 hrs
Total time for deluxes = 1*7 = 7 hrs

Deluxe / Total time = 7/(10+7) = 7/17
Jake Becker
Academic Director
Grockit Test Prep
https://www.grockit.com
Join the discussion