EMPOWERgmat
An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?
A. 42
B. 45
C. 48
D. 50
E. 55
OA C
An assembly line produces 40 cogs per hour until an initial
This topic has expert replies
- fskilnik@GMATH
- GMAT Instructor
- Posts: 1449
- Joined: Sat Oct 09, 2010 2:16 pm
- Thanked: 59 times
- Followed by:33 members
$$? = {{\# \,\,{\rm{cogs}}} \over {\# \,\,{\rm{hours}}}}$$AAPL wrote:EMPOWERgmat
An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?
A. 42
B. 45
C. 48
D. 50
E. 55
Trivial application of UNITS CONTROL, one of the most powerful tools of our method!
$${V_1} = {{40\,\,{\rm{cogs}}} \over {{\rm{1}}\,\,{\rm{h}}}}\,\,\,{\rm{for}}\,\,\,60\,\,{\rm{cogs}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,\,{T_1}\,\,\, = \,\,\,60\,\,{\rm{cogs}}\,\,\,\left( {{{1\,\,{\rm{h}}} \over {40\,\,cogs}}} \right)\,\,\, = \,\,\,{3 \over 2}\,\,{\rm{h}}$$
$${V_2} = {{60\,\,{\rm{cogs}}} \over {{\rm{1}}\,\,{\rm{h}}}}\,\,\,{\rm{for}}\,\,\,\left( {{\rm{extra}}} \right)\,\,60\,\,{\rm{cogs}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,\,{T_2}\,\,\, = \,\,\,60\,\,{\rm{cogs}}\,\,\,\left( {{{1\,\,{\rm{h}}} \over {60\,\,cogs}}} \right)\,\,\, = \,\,\,1\,\,{\rm{h}}$$
$${\rm{?}}\,\,\,\,{\rm{ = }}\,\,\,\,{{60 + 60} \over {{3 \over 2} + 1}}\,\,\,\, = \,\,\,\,{{2 \cdot 120} \over 5}\,\,\,\, = \,\,\,\,48\,\,\,\left[ {{{{\rm{cogs}}} \over {\rm{h}}}} \right]$$
This solution follows the notations and rationale taught in the GMATH method.
Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
GMAT/MBA Expert
- Scott@TargetTestPrep
- GMAT Instructor
- Posts: 7261
- Joined: Sat Apr 25, 2015 10:56 am
- Location: Los Angeles, CA
- Thanked: 43 times
- Followed by:29 members
AAPL wrote:EMPOWERgmat
An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?
A. 42
B. 45
C. 48
D. 50
E. 55
Since the assembly line produces the first 60 cogs in 60/40 = 1.5 hours and the next 60 cogs in 60/60 = 1 hour, the average output, in cogs per hour, is:
(60 + 60)/(1.5 + 1) = 120/2.5 = 48
Answer: C
Scott Woodbury-Stewart
Founder and CEO
[email protected]
See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews