An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?

A. 42
B. 45
C. 48
D. 50
E. 55

OA C
Join the discussion
Source: — Problem Solving |

by fskilnik@GMATH » Tue Jan 15, 2019 5:07 am
AAPL wrote:EMPOWERgmat

An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?

A. 42
B. 45
C. 48
D. 50
E. 55
$$? = {{\# \,\,{\rm{cogs}}} \over {\# \,\,{\rm{hours}}}}$$
Trivial application of UNITS CONTROL, one of the most powerful tools of our method!

$${V_1} = {{40\,\,{\rm{cogs}}} \over {{\rm{1}}\,\,{\rm{h}}}}\,\,\,{\rm{for}}\,\,\,60\,\,{\rm{cogs}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,\,{T_1}\,\,\, = \,\,\,60\,\,{\rm{cogs}}\,\,\,\left( {{{1\,\,{\rm{h}}} \over {40\,\,cogs}}} \right)\,\,\, = \,\,\,{3 \over 2}\,\,{\rm{h}}$$
$${V_2} = {{60\,\,{\rm{cogs}}} \over {{\rm{1}}\,\,{\rm{h}}}}\,\,\,{\rm{for}}\,\,\,\left( {{\rm{extra}}} \right)\,\,60\,\,{\rm{cogs}}\,\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,\,{T_2}\,\,\, = \,\,\,60\,\,{\rm{cogs}}\,\,\,\left( {{{1\,\,{\rm{h}}} \over {60\,\,cogs}}} \right)\,\,\, = \,\,\,1\,\,{\rm{h}}$$

$${\rm{?}}\,\,\,\,{\rm{ = }}\,\,\,\,{{60 + 60} \over {{3 \over 2} + 1}}\,\,\,\, = \,\,\,\,{{2 \cdot 120} \over 5}\,\,\,\, = \,\,\,\,48\,\,\,\left[ {{{{\rm{cogs}}} \over {\rm{h}}}} \right]$$

This solution follows the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by Scott@TargetTestPrep » Thu Jan 17, 2019 5:58 pm
AAPL wrote:EMPOWERgmat

An assembly line produces 40 cogs per hour until an initial order of 60 cogs is completed. The speed of the assembly line is then immediately increased so that it can produce 60 cogs per hour until another 60 cogs are produced. What is the average output, in cogs per hour, for the assembly line during this time?

A. 42
B. 45
C. 48
D. 50
E. 55

Since the assembly line produces the first 60 cogs in 60/40 = 1.5 hours and the next 60 cogs in 60/60 = 1 hour, the average output, in cogs per hour, is:

(60 + 60)/(1.5 + 1) = 120/2.5 = 48

Answer: C