BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Machines A and B, working together, take t minutes to

Expert replies
by BTGmoderatorLU » Sat Jan 26, 2019 7:45 pm

Timer

00:00

Answers

A

0%

B

0%

C

0%

D

0%

E

0%

Stats

Difficulty

0% CorrectAvg —

0% IncorrectAvg —

Source: Veritas Prep

Machines A and B, working together, take t minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than t to complete the same work. Machine B, working alone, takes 25 minutes more than t to complete the same work. What is the ratio of the time taken by machine A to the time taken by machine B to complete this work?

A. 5:8
B. 8:5
C. 25:64
D. 25:39
E. 64:25

The OA is B
Join the discussion
Source: — Problem Solving |

by GMATGuruNY » Sun Jan 27, 2019 4:05 am
BTGmoderatorLU wrote:Source: Veritas Prep

Machines A and B, working together, take t minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than t to complete the same work. Machine B, working alone, takes 25 minutes more than t to complete the same work. What is the ratio of the time taken by machine A to the time taken by machine B to complete this work?

A. 5:8
B. 8:5
C. 25:64
D. 25:39
E. 64:25
Always keep your eye on the answer choices.

Since A's time alone (t+64) is greater than B's time alone (t+25), the ratio of A's time alone to B's time alone must be GREATER THAN 1.
Eliminate A, C and D.

Since the ratio of A's time to B's time = (t+64)/(t+25), option E implies the following:
(t+64)/(t+25) = 64/25.
The resulting equation is valid only if t=0.
Not possible.
Eliminate E.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by fskilnik@GMATH » Sun Jan 27, 2019 4:59 am
BTGmoderatorLU wrote:Source: Veritas Prep

Machines A and B, working together, take t minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than t to complete the same work. Machine B, working alone, takes 25 minutes more than t to complete the same work. What is the ratio of the time taken by machine A to the time taken by machine B to complete this work?

A. 5:8
B. 8:5
C. 25:64
D. 25:39
E. 64:25
$${\rm{times}}\,\,{\rm{A,}}\,B\,\,\,\,\,\, \to \,\,\,\,\,\min $$
$$? = {A \over B}$$

$$\left( * \right)\,\,\,\left\{ \matrix{
A = t + 64 \hfill \cr
B = t + 25 \hfill \cr} \right.$$
$${1 \over A} + {1 \over B} = {1 \over t}\,\,\,\,\left( {{\rm{stem}}} \right)\,\,\,\,\,\, \Rightarrow \,\,\,\,\,\,{{1 \cdot B} \over {A \cdot B}} + {{1 \cdot A} \over {B \cdot A}} = {1 \over t}\,\,\,\,\,\mathop \Rightarrow \limits^{\left( * \right)} \,\,\,\,\,{{2t + 89} \over {\left( {t + 64} \right)\left( {t + 25} \right)}} = {1 \over t}$$
$$2{t^2} + 89t = {t^2} + 89t + 25 \cdot 64\,\,\,\,\,\,\mathop \Rightarrow \limits^{t\,\, > \,\,0} \,\,\,\,\,t = 5 \cdot 8 = 40$$

$$?\,\,\,\mathop = \limits^{\left( * \right)} \,\,\,{{40 + 64} \over {40 + 25}}\,\, = \,\,{{104:13} \over {65:13}} = {8 \over 5}$$


We follow the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br
Join the discussion

by GMATGuruNY » Sun Jan 27, 2019 7:59 am
BTGmoderatorLU wrote:Source: Veritas Prep

Machines A and B, working together, take t minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than t to complete the same work. Machine B, working alone, takes 25 minutes more than t to complete the same work. What is the ratio of the time taken by machine A to the time taken by machine B to complete this work?

A. 5:8
B. 8:5
C. 25:64
D. 25:39
E. 64:25
One more approach:

Since A+B together complete the job in t minutes:
Job = (A's output in t minutes) + (B's output in t minutes)

If A works alone for t minutes, A can then complete the rest of the job in 64 minutes.
In this case, the rest of the job = B's output in t minutes.
Thus, A's output in 64 minutes is equal to B's output in t minutes:
A/64 = B/t
A/B = 64/t

If B works alone for t minutes, B can then complete the rest of the job in 25 minutes.
In this case, the rest of the job = A's output in t minutes.
Thus, A's output in t minutes is equal to B's output in 25 minutes:
A/t = B/25
A/B = t/25

The expressions in blue are both equal to A/B and thus must be equal to each other:
t/25 = 64/t
t² = 25*64
t = 5*8
t = 40

Thus:
A's time alone = t+64 = 40+64 = 104
B's time alone = t+25 = 40+25 = 65
(A's time alone) : (B's time alone) = 104:65 = (8*13) : (5*13) = 8:5

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Join the discussion

by [email protected] » Sun Jan 27, 2019 12:30 pm
Hi All,

We're told that Machines A and B, working together, take T minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than T to complete the same work. Machine B, working alone, takes 25 minutes more than T to complete the same work. We're asked for the ratio of the time taken by machine A to the time taken by machine B to complete this work. While this question is layered, it's ultimately a "Work Formula" question, so you can use the Work Formula - and a bit of Algebra - to solve it.

Work = (A)(B)/(A+B) where A and B are the individual times needed to complete the task

In this prompt, we have:
A = T + 64
B = T + 25

Substituting in those values, we have:

(T+64)(T+25)/(T+64 + T+25) = T

(T^2 + 89T + 1600)/(2T + 89) = T
T^2 + 89T + 1600 = T(2T + 89)
T^2 + 89T + 1600 = 2T^2 + 89T
1600 = T^2
T = +40 or -40

Since we cannot have a "negative time" for T, we know that T MUST be 40 minutes, meaning that the two individuals times for A and B are:
A = 40 + 64 = 104 minutes
B = 40 + 25 = 65 minutes
A/B = 104/65 = 8/5

Final Answer: B

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Wed Jan 30, 2019 6:03 pm
BTGmoderatorLU wrote:Source: Veritas Prep

Machines A and B, working together, take t minutes to complete a particular work. Machine A, working alone, takes 64 minutes more than t to complete the same work. Machine B, working alone, takes 25 minutes more than t to complete the same work. What is the ratio of the time taken by machine A to the time taken by machine B to complete this work?

A. 5:8
B. 8:5
C. 25:64
D. 25:39
E. 64:25

The OA is B
We can let a = the number of minutes A can finish the work by itself and b = the number of minutes B can finish the work by itself. Thus, their rates are 1/a and 1/b, respectively. We can create the equations:

t(1/a) + t(1/b) = 1

(t + 64)(1/a) = 1

and

(t + 25)(1/b) = 1

From the second and third equations, we see that 1/a = 1/(t + 64) and 1/b = 1/(t + 25). Substituting these into the first equation, we have:

t(1/(t + 64)) + t(1/(t + 25)) = 1

Multiplying both sides by (t + 64)(t + 25), we have:

t(t + 25) + t(t + 64) = (t + 64)(t + 25)

t^2 + 25t + t^2 + 64t = t^2 + 25t + 64t + 1600

t^2 = 1600

t = ±40

Since t can't be negative, t = 40. Therefore, a = 40 + 64 = 104 and b = 40 + 25 = 65. So the ratio of the time taken by machine A to the time taken by machine B to complete this work is 104:65 = 8:5.

Answer: B

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion