a leak in bottom

This topic has expert replies
User avatar
GMAT Instructor
Posts: 3650
Joined: Wed Jan 21, 2009 4:27 am
Location: India
Thanked: 267 times
Followed by:80 members
GMAT Score:760

a leak in bottom

by sanju09 » Mon Apr 06, 2009 4:21 am
A cistern is filled by an inlet valve in 5 hours. However because of a leak in bottom, it takes 30 minutes more to fill up. In how much time will the leak empty the filled cistern independently?
A. 5.5 hours
B. 55/21 hours
C. 55 hours
D. 11 hours
E. 50 hours
The mind is everything. What you think you become. -Lord Buddha



Sanjeev K Saxena
Quantitative Instructor
The Princeton Review - Manya Abroad
Lucknow-226001

www.manyagroup.com

Junior | Next Rank: 30 Posts
Posts: 13
Joined: Wed Sep 19, 2007 8:06 pm
Followed by:1 members

by tacosychelas » Mon Apr 06, 2009 4:52 am
C

Formula: Work/Time

1/5 - 1/X = 1/5.5

X=55

Senior | Next Rank: 100 Posts
Posts: 60
Joined: Thu Feb 26, 2009 12:50 pm
Location: Chicago
Thanked: 3 times

by rossmj » Mon Apr 06, 2009 2:20 pm
I get E. 50 hours.

The rate the tank is being filled is 1tank/5hours or 1tank/300min the time is 5.5 hrs or 330 min. So 10% longer than it should have taken. So the rate the tank is leaking would be 1/10th the rate it is being filled or 1tank/3000mins or 1tank/50hours.

Please correct me if I'm wrong and let me know where my logic failed.

User avatar
Legendary Member
Posts: 2134
Joined: Mon Oct 20, 2008 11:26 pm
Thanked: 237 times
Followed by:25 members
GMAT Score:730

by logitech » Mon Apr 06, 2009 2:58 pm
tacosychelas wrote:C

Formula: Work/Time

1/5 - 1/X = 1/5.5

X=55
Great solution.

5X=5.5(X-Y)

X=11Y

So 5 hrs vs 55 hrs
LGTCH
---------------------
"DON'T LET ANYONE STEAL YOUR DREAM!"

Master | Next Rank: 500 Posts
Posts: 487
Joined: Fri Mar 27, 2009 5:49 am
Thanked: 36 times

by dtweah » Mon Apr 06, 2009 6:01 pm
tacosychelas wrote:C

Formula: Work/Time

1/5 - 1/X = 1/5.5

X=55
Good soln Logit. For formula or algebra haters just do

1/5 -1/5.5= 1/55. (TAke the difference between per hour work done without and with the leak and you get the per hour work done by the leak)