Geometry

This topic has expert replies
User avatar
Senior | Next Rank: 100 Posts
Posts: 39
Joined: Thu Feb 21, 2013 1:53 am
Thanked: 1 times

Geometry

by kartikc11 » Sun Jun 22, 2014 11:21 pm
I am not entirely sure how this can be solved. What level would this be at?
Attachments
gmat prep ds3.png

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Mon Jun 23, 2014 9:41 am
The cost of a square slab is proportional to its thickness and also proportional to the square of its length. What is the cost of a square slab that is 3 meters long and 0.1 meter thick?

1) The cost of square slab that is 2 meters long and 0.2 meter thick is $160 more than the cost of a square slab that is 2 meters long and 0.1 meters thick.

2) The cost of square slab that is 3 meters long and 0.1 meter thick is $200 more than the cost of a square slab that is 2 meters long and 0.1 meter thick.
x is directly proportional to y implies the following:
x/y = k.
x = ky.
In each case, k is a CONSTANT.

The cost of a square slab is proportional to its thickness and also proportional to the square of its length.
Thus:
c = k * T * L².

What is the cost of a square slab that is 3 meters long and 0.1 meter thick?
Since c = k * T * L², we get:
c = k * 0.1 * 3²
c = 0.9k.
To determine the value of c, we need to know the value of k.

Question rephrased: What is the value of k?

Statement 1: The cost of a square slab that is 2 meters long and 0.2 meter thick is $160 more than the cost of a square slab that is 2 meters long and 0.1 meters thick.
Cost of a square slab that is 2 meters long and 0.2 meter thick = k * 0.2 * 2² = .8k.
Cost of a square slab that is 2 meters long and 0.1 meter thick = k * 0.1 * 2² = .4k.
Since the difference in cost is $160, we get:
0.8k - 160 = 0.4
0.4k = 160
k = 160/0.4 = 1600/4 = 400.
SUFFICIENT.

Statement 2: The cost of a square slab that is 3 meters long and 0.1 meter thick is $200 more than the cost of a square slab that is 2 meters long and 0.1 meter thick.
Cost of a square slab that is 3 meters long and 0.1 meter thick = k * 0.1 * 3² = .9k.
Cost of a square slab that is 2 meters long and 0.1 meter thick = k * 0.1 * 2² = .4k.
Since the difference in cost is $200, we get:
0.9k - 200 = 0.4k
0.5k = 200
k = 200/0.5 = 2000/5 = 400.
SUFFICIENT.

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3