Machine M and Machine N working alone at their constant rates, non-stop, produced 6000 and 8000 nails respectively. Did machine M work longer than machine N?

1) Machine N produces 2000 more nails than machine M in one hour when each machine work at its constant rate.
2) Machine N produces twice as much as machine M in one hour when each machine work at its constant rate.

The OA is B

Source: GMAT Prep

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 3008
Joined: Mon Aug 22, 2016 6:19 am
Location: Grand Central / New York
Thanked: 470 times
Followed by:34 members

by Jay@ManhattanReview » Sat Jan 05, 2019 3:54 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

swerve wrote:Machine M and Machine N working alone at their constant rates, non-stop, produced 6000 and 8000 nails respectively. Did machine M work longer than machine N?

1) Machine N produces 2000 more nails than machine M in one hour when each machine work at its constant rate.
2) Machine N produces twice as much as machine M in one hour when each machine work at its constant rate.

The OA is B

Source: GMAT Prep
Say Machine M works for x hours and Machine N works for y hours.

We have to determine whether x > y.

Let's take each statement one by one.

1) Machine N produces 2000 more nails than machine M in one hour when each machine work at its constant rate.

=> 2000 = 8000/y - 6000/x

1 = 4/y - 3/x

=> 4/y > 3/x

x/y > 3/4

Case 1: Say x/y = 4/5 > 3/4, then we have y > x.
Case 2: Say x/y = 5/4 > 3/4, then we have x > y.

No unique answer. Insufficient.

2) Machine N produces twice as much as machine M in one hour when each machine work at its constant rate.

=> 8000/y = 2*(6000/x)

x/y = 3/2

=> x > y. Sufficient.

The correct answer: B

Hope this helps!

-Jay
_________________
Manhattan Review

Locations: Manhattan Review New Delhi | GMAT Prep Malleswaram | GRE Prep Vijayawada | Mumbai GRE Coaching | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Sat Jan 05, 2019 4:56 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

swerve wrote:Machine M and Machine N working alone at their constant rates, non-stop, produced 6000 and 8000 nails respectively. Did machine M work longer than machine N?

1) Machine N produces 2000 more nails than machine M in one hour when each machine work at its constant rate.
2) Machine N produces twice as much as machine M in one hour when each machine work at its constant rate.
Statement 1:
Case 1: N = 4000 nails per hour, M = 2000 nails per hour
Since N's rate = 4000 nails per hour, the time for N to produce 8000 nails = 8000/4000 = 2 hours.
Since M's rate = 2000 nails per hour, the time for M to produce 6000 nails = 6000/2000 = 3 hours.
In this case, M works longer than N, so the answer to the question stem is YES.

Case 2: N = 12000 nails per hour, M = 10000 nails per hour
Since N's rate = 12000 nails per hour, the time for N to produce 8000 nails = 8000/12000 = 2/3 hour = 40 minutes.
Since M's rate = 10000 nails per hour, the time for M to produce 6000 nails = 6000/10000 = 3/5 hour = 36 minutes
In this case, N works longer than M, so the answer to the question stem is NO.

Since the answer is YES in Case 1 but NO in Case 2, INSUFFICIENT.

Statement 2:
In other words, N is twice as fast as M.
If N and M were to work for the same amount of time, then N's 8000-nail production would imply a 4000-nail production for M.
Since M actually produces 6000 nails -- more than 4000 -- M must work for LONGER than N.
Thus, the answer to the question stem is YES.
SUFFICIENT.

The correct answer is B.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3