work

This topic has expert replies
Master | Next Rank: 500 Posts
Posts: 138
Joined: Mon May 01, 2017 11:56 pm
Thanked: 4 times

work

by vaibhav101 » Sun Jun 03, 2018 9:42 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?
A 30 days
B 40 days
C 60 days
D 70 days
E 100 days

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Sun Jun 03, 2018 11:25 am
vaibhav101 wrote:A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?
A 30 days
B 40 days
C 60 days
D 70 days
E 100 days
We can PLUG IN THE ANSWERS, which represent B's time to produce the entire job alone.
Since B takes 44 days to produce part of the job, B's time to produce the entire job must be more than 44 days.
Eliminate A and B.
When the correct answer is plugged in, the time for B to complete the job after A works for 16 days = 44 days.

D: 70 days
Let the job = 210 units.
Since B takes 70 days to produce the 210-unit job, B's rate = w/t = 210/70 = 3 units per day.
Since A and B together take 30 days to produce the 210-unit job, the combined rate for A+B together = w/t = 210/30 = 7 units per day.
A's rate alone = (rate for A+B together) - (B's rate alone) = 7 - 3 = 4 units per day.
Work produced by A in 16 days = rt = 4*16 = 64 units.
Remaining work = 210 - 64 = 146 units.
Since B's rate = 3 units per day, the time for B to produce the remaining 146 units = w/r = 146/3 = 48.66 days.
Here, B takes TOO LONG to finish the job.
Implication:
To finish the job in only 44 days, B must work FASTER, implying that B must take LESS TIME to produce the entire job.

The correct answer is C.

B: 60 days
Let the job = 60 units.
Since B takes 60 days to produce the 60-unit job, B's rate = w/t = 60/60 = 1 unit per day.
Since A and B together take 30 days to produce the 60-unit job, the combined rate for A+B together = w/t = 60/30 = 2 units per day.
A's rate alone = (rate for A+B together) - (B's rate alone) = 2 - 1 = 1 unit per day.
Work produced by A in 16 days = rt = 1*16 = 16 units.
Remaining work = 60 - 16 = 44 units.
Since B's rate = 1 unit per day, the time for B to produce the remaining 44 units = w/r = 44/1 = 44 days.
Success!
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 7263
Joined: Sat Apr 25, 2015 10:56 am
Location: Los Angeles, CA
Thanked: 43 times
Followed by:29 members

by Scott@TargetTestPrep » Tue Jun 05, 2018 9:39 am
vaibhav101 wrote:A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?
A 30 days
B 40 days
C 60 days
D 70 days
E 100 days
We can let a and b, respectively, be the number of days A and B need to complete the work alone. Thus, the rate of A = 1/a and the rate of B = 1/b. We can create the following equations:

30(1/a) + 30(1/b) = 1

and

16(1/a) + 44(1/b) = 1

Since we need to solve b, let's cancel a by multiplying the first equation by 8 and the second by 15:

240/a + 240/b = 8

and

240/a + 660/b = 15

Subtracting the top equation from the bottom equation, we have:

420/b = 7

420/7 = b

60 = b

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage