BREAKING: Target Test Prep releases Brand New 2026 On Demand GMAT prep course

Redeem

Target Test Prep · GMAT

Choose how you want to prepare

Learn live with an expert or move at your own pace. Every option includes the complete TTP study system.

★★★★★5.0559 reviews
GMATBootcamp Starts Sep 28
Chris Peckover, Target Test Prep GMAT expert
LIVE ONLINE BOOTCAMP

Live Online Bootcamp Class with Top GMAT Expert Chris Peckover

15 live classes from Sep 28, 2026

Schedule
Mon to Fri · 7:00 to 10:00 PM ET
Included
Live classes + 6 months of TTP OnDemand
  • Boost your GMAT score in less than one month in a live online class
  • 6 months access to TTP OnDemand video courses included
View bootcamp & enroll
Limited cohort · enrollment openTarget Test Prep
EALiveTeach 5 seats left
Logan Thompson
EXECUTIVE ASSESSMENT

Sep 6 to Dec 6, 2026

with Logan Thompson

Schedule
Sun · 9:30 AM to 12:30 PM ET
Included
40 hours of live online classes plus six months of access to the complete TTP EA OnDemand course.
  • 165+ EA Score Guarantee
  • 4,100+ Quant, Verbal, and Integrated Reasoning practice questions
  • 400+ hours of in-depth video lessons
  • 3,000+ step-by-step video solutions
View EA class & enroll
Limited cohort · enrollment openTarget Test Prep
GMATOnDemand Start anytime
SELF-PACED MASTERCLASS

Target Test Prep GMAT OnDemand

Complete access from day one. Study on your schedule.

715+ score guarantee
$0to start then $127/mo
  • Personalized study plan and analytics
  • Thousands of lessons and practice questions

Compare the format, schedule, and included access before enrolling. Prices and seat counts shown reflect the supplied offer details.

If a certain concrete mixture contains gravel, water, and

Expert replies
by AAPL » Wed Jan 16, 2019 5:45 am

Timer

00:00

Answers

A

B

C

D

E

Stats

Difficulty—

Princeton Review

If a certain concrete mixture contains gravel, water, and sand in a 1 to 3 to 5 ratio by weight, how many pounds of gravel would be needed to produce 72 pounds the mixture?

A. 72
B. 40
C. 24
D. 9
E. 8

OA E
Join the discussion
Source: — Problem Solving |

by swerve » Wed Jan 16, 2019 10:21 am
We can solve this question as follows,

1X + 3X + 5X = 72
9X = 72
X=8.

Hence, E is the correct answer.
Join the discussion

by [email protected] » Wed Jan 16, 2019 10:42 am
Hi All,

We're told that a certain concrete mixture contains gravel, water, and sand in a ratio of 1 to 3 to 5 by weight. We're asked for the number of pounds of gravel that would be needed to produce 72 pounds of the mixture. This math behind this question can be approached in a number of different ways (depending on how you want to work through your calculations).

To start, a ratio of 1:3:5 means that for every 1 pound of gravel, we'll need 3 pounds of water and 5 pounds of sand. In essence, for every 1+3+5 = 9 pounds of this mixture, 1 pound of it will be gravel.

With 72 total pounds, we have 72/9 = 8 'sets' of the 1:3:5 mixture described), so we would have 8(1) = 8 pounds of gravel, 8(3) = 24 pounds of water and 8(5) = 40 pounds of sand. You'll notice that all 3 of those numbers are in the answer choices; we're asked for the number of pounds of GRAVEL though...

Final Answer: E

GMAT assassins aren't born, they're made,
Rich
Contact Rich at [email protected]
Image
Join the discussion

by Scott@TargetTestPrep » Mon Jan 21, 2019 5:49 pm
AAPL wrote:Princeton Review

If a certain concrete mixture contains gravel, water, and sand in a 1 to 3 to 5 ratio by weight, how many pounds of gravel would be needed to produce 72 pounds the mixture?

A. 72
B. 40
C. 24
D. 9
E. 8
We can create the ratio:

Gravel : water : sand = x : 3x : 5x

We can create the equation:

x + 3x + 5x = 72

9x = 72

x = 8

So the number of pounds of gravel is 8.

Answer: E

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage
Join the discussion