| View previous topic :: View next topic |
| Author |
Message |
dferm GMAT Destroyer!
Joined: 26 Jul 2007 Posts: 375
Thanks given: 34 Thanked 1 times in 1 posts
|
Posted: Mon Mar 24, 2008 1:38 pm Post subject: GMAT PREP???? |
|
|
A company has two types of machines, type R and type S. Operating at a constant rate, a machine of type R does a certain job in 36 hours and a machine of type S does the same job in 18 hours. If the company used the same number of each type of machine to do the job in 2 hours, how many machines of type R were used?
A. 3
B. 4
C. 6
D. 9
E. 12 |
|
| Back to top |
|
 |
|
|
xilef Rising GMAT Star
Joined: 31 Jan 2008 Posts: 99
Thanks given: 3 Thanked 12 times in 12 posts
|
Posted: Mon Mar 24, 2008 1:58 pm Post subject: |
|
|
using work formula to find the time it takes for both machines to do the same work:
(18*36)/54=12 hrs for both machines to complete the job
2 hrs is 6 times faster so the company needs 6 of each to do it in 12hr.
Answer C. |
|
| Back to top |
|
 |
preciousrain7 Rising GMAT Star
Joined: 06 Dec 2007 Posts: 78
Thanks given: 9 Thanked 2 times in 2 posts
Location: NYC, NY Test Date: Jan 25th Target GMAT Score: 700
|
Posted: Mon Mar 24, 2008 2:47 pm Post subject: |
|
|
| xilef wrote: | using work formula to find the time it takes for both machines to do the same work:
(18*36)/54=12 hrs for both machines to complete the job
2 hrs is 6 times faster so the company needs 6 of each to do it in 12hr.
Answer C. |
Can you give more explanation for the last step please? Thanks! |
|
| Back to top |
|
 |
xilef Rising GMAT Star
Joined: 31 Jan 2008 Posts: 99
Thanks given: 3 Thanked 12 times in 12 posts
|
Posted: Mon Mar 24, 2008 3:04 pm Post subject: |
|
|
| It takes both working together (one of each machine) to do the job in 12hrs. The company used the same number of each type of machine to do the job in 2 hours, which is 6 times faster than the the time it takes one of each machine to do the job, therefore, company used 6 of each. |
|
| Back to top |
|
 |
preciousrain7 Rising GMAT Star
Joined: 06 Dec 2007 Posts: 78
Thanks given: 9 Thanked 2 times in 2 posts
Location: NYC, NY Test Date: Jan 25th Target GMAT Score: 700
|
Posted: Mon Mar 24, 2008 3:31 pm Post subject: |
|
|
| xilef wrote: | | It takes both working together (one of each machine) to do the job in 12hrs. The company used the same number of each type of machine to do the job in 2 hours, which is 6 times faster than the the time it takes one of each machine to do the job, therefore, company used 6 of each. |
thanks! |
|
| Back to top |
|
 |
|
|
daduck112 Just gettin' started!
Joined: 31 Jul 2007 Posts: 1
Thanks given: 0 Thanked 0 times in 0 posts
|
Posted: Mon Jul 07, 2008 1:09 pm Post subject: |
|
|
another way to look at things...
R does 1/36 the job
S does 1/18 the job
R+S = 1/12 the job or 12 hours to do 1 job
you want to do it in 2 hours....
so you you'll 12/2 = {6 machines each.} |
|
| Back to top |
|
 |
AleksandrM GMAT Destroyer!

Joined: 04 Jan 2008 Posts: 475
Thanks given: 11 Thanked 17 times in 17 posts
Location: Philadelphia Test Date: September 8, 2008 Target GMAT Score: 650
|
Posted: Mon Jul 07, 2008 4:05 pm Post subject: |
|
|
1/36 + 1/18 = 1/12 so together they can do 1 job in 12 hours. Then, I set up the following equation:
2/1/12 = x/1/2 [translation: if 2 machines complete 1 job in 12, then how many machines will complete 1 job in 2 hours?]
24 = 2x
x = 12 machines, 6 of each type. _________________ http://second-lap.blogspot.com/ |
|
| Back to top |
|
 |
|