Twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. How many additional machines, each running at the same constant rate, would be needed to reduce the time required to complete a shipment by two days?
A. 2
B. 3
C. 4
D. 6
E. 9
OA C
Twelve identical machines, running continuously at the same
This topic has expert replies
GMAT/MBA Expert
- [email protected]
- Elite Legendary Member
- Posts: 10392
- Joined: Sun Jun 23, 2013 6:38 pm
- Location: Palo Alto, CA
- Thanked: 2867 times
- Followed by:511 members
- GMAT Score:800
Hi All,
We're told that twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. We're asked how many ADDITIONAL machines, each running at the same constant rate, would be needed to REDUCE the time required to complete a shipment BY two days.
In these types of 'work' questions, it often helps to calculate the total amount of work needed, then consider the other variables involved. Here, since we have 12 machines EACH working for 8 days, the total amount of work to complete a shipment would be...
(12 machines)(8 days each) = 96 machine-days of work
Thus, 1 machine would need 96 days to complete the job
2 machines would need 48 days each to complete the job
3 machines would need 32 days each to complete the job
Etc.
We're asked to reduce the total time by 2 days, meaning that the job should take 6 days to complete. That would require...
(96 machine days of work)/(6 total days) = 16 machines needed, each working for 6 days. We already have 12 machines, so we would need 4 more machines.
Final Answer: C
GMAT assassins aren't born, they're made,
Rich
We're told that twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. We're asked how many ADDITIONAL machines, each running at the same constant rate, would be needed to REDUCE the time required to complete a shipment BY two days.
In these types of 'work' questions, it often helps to calculate the total amount of work needed, then consider the other variables involved. Here, since we have 12 machines EACH working for 8 days, the total amount of work to complete a shipment would be...
(12 machines)(8 days each) = 96 machine-days of work
Thus, 1 machine would need 96 days to complete the job
2 machines would need 48 days each to complete the job
3 machines would need 32 days each to complete the job
Etc.
We're asked to reduce the total time by 2 days, meaning that the job should take 6 days to complete. That would require...
(96 machine days of work)/(6 total days) = 16 machines needed, each working for 6 days. We already have 12 machines, so we would need 4 more machines.
Final Answer: C
GMAT assassins aren't born, they're made,
Rich
GMAT/MBA Expert
- Jay@ManhattanReview
- GMAT Instructor
- Posts: 3008
- Joined: Mon Aug 22, 2016 6:19 am
- Location: Grand Central / New York
- Thanked: 470 times
- Followed by:34 members
It is given that currently, 12 machines complete the work in 8 days and we want the work to be completed within 8 - 2 = 6 days. Since the number of days are reduced by a factor 6/8 = 3/4, we need a greater number of machines, i.e., a total of 12*(4/3) = 16 machines.AAPL wrote:Manhattan Prep
Twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. How many additional machines, each running at the same constant rate, would be needed to reduce the time required to complete a shipment by two days?
A. 2
B. 3
C. 4
D. 6
E. 9
OA C
Thus, the number of additional machines = 16 - 12 = 4.
The correct answer: C
Hope this helps!
-Jay
_________________
Manhattan Review GMAT Prep
Locations: Manhattan Review Dilsukhnagar | Hyderabad GMAT Prep | Bangalore GMAT Courses | Kukatpally GRE Prep | and many more...
Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.
- GMATGuruNY
- GMAT Instructor
- Posts: 15539
- Joined: Tue May 25, 2010 12:04 pm
- Location: New York, NY
- Thanked: 13060 times
- Followed by:1906 members
- GMAT Score:790
One approach is to use the following equation:AAPL wrote:Manhattan Prep
Twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. How many additional machines, each running at the same constant rate, would be needed to reduce the time required to complete a shipment by two days?
A. 2
B. 3
C. 4
D. 6
E. 9
(machines)(time) / output = (machines)(time) / output
In the equation above:
Machines and time are INVERSELY PROPORTIONAL.
As the number of machines increases, the amount of time required to produce the same output decreases.
Machines and output are DIRECTLY PROPORTIONAL.
As the number of machines increases, the amount of output also increases.
Time and output are also DIRECTLY PROPORTIONAL.
As the amount of time increases, the amount of output also increases.
In the problem above:
(12 machines)(8 days)/(1 shipment) = (x machines)(6 days)/(1 shipment)
12*8 = 6x
16 = x.
Since the number of machines must increase to 16 from 12, the number of additional machines required = 16-12 = 4.
The correct answer is C.
Similar problem:
https://www.beatthegmat.com/work-rate-p ... 97557.html
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.
As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.
For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3
GMAT/MBA Expert
- Scott@TargetTestPrep
- GMAT Instructor
- Posts: 7242
- Joined: Sat Apr 25, 2015 10:56 am
- Location: Los Angeles, CA
- Thanked: 43 times
- Followed by:29 members
We are given that 12 machines have a rate of 1/8. We want the shipment to be completed in 6 days, which means that the rate would be 1/6. We need to determine the number of machines necessary to have that rate of 1/6. We can create the following proportion in which n = the new number of machines:AAPL wrote:Manhattan Prep
Twelve identical machines, running continuously at the same constant rate, take 8 days to complete a shipment. How many additional machines, each running at the same constant rate, would be needed to reduce the time required to complete a shipment by two days?
A. 2
B. 3
C. 4
D. 6
E. 9
OA C
12/(1/8) = n(/1/6)
Multiplying the left side by 8/8 and the right side by 6/6, we get:
96 = 6n
16 = n
Thus, there would need to be 4 additional machines.
Answer: C