If Anil can finish a job in 4 hours and Gustavo can finish the same job in 6 hours, how long would it take them, working together at their respective rates, to complete the job?

A. 1 hour, 50 minutes
B. 2 hours, 10 minutes
C. 2 hours, 24 minutes
D. 3 hours, 45 minutes
E. 4 hours, 30 minutes

OA C

Source: Princeton Review

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 2621
Joined: Mon Jun 02, 2008 3:17 am
Location: Montreal
Thanked: 1090 times
Followed by:355 members
GMAT Score:780

by Ian Stewart » Tue Jul 09, 2019 7:04 am
Anil would do 3 jobs in 12 hours, Gustavo 2 jobs in 12 hours, so together 5 jobs in 12 hours, and thus 1 job in 12/5 hours = 2.4 hours = 2 hours and 24 minutes.
For online GMAT math tutoring, or to buy my higher-level Quant books and problem sets, contact me at ianstewartgmat at gmail.com

ianstewartgmat.com

Legendary Member
Posts: 2218
Joined: Sun Oct 29, 2017 2:04 pm
Followed by:6 members

by swerve » Tue Jul 09, 2019 5:40 pm
Rate of \(A = \frac{1}{4}\) and rate of \(G= \frac{1}{6}\)

Together they can work at a rate \(= \frac{10}{24}\)

time \(= \frac{24}{10} \cdot 60 = 144\) minutes

or say \(2\) hours, \(24\) minutes. __C__

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 7223
Joined: Sat Apr 25, 2015 10:56 am
Location: Los Angeles, CA
Thanked: 43 times
Followed by:29 members

by Scott@TargetTestPrep » Wed Jul 10, 2019 4:19 pm
BTGmoderatorDC wrote:If Anil can finish a job in 4 hours and Gustavo can finish the same job in 6 hours, how long would it take them, working together at their respective rates, to complete the job?

A. 1 hour, 50 minutes
B. 2 hours, 10 minutes
C. 2 hours, 24 minutes
D. 3 hours, 45 minutes
E. 4 hours, 30 minutes

OA C

Source: Princeton Review
Their combined rate is 1/4 + 1/6 = 6/24 + 4/24 = 10/24 = 5/12. Therefore, when working together, they can finish the job in 1/(5/12) = 12/5 = 2 2/5 hours, i.e., 2 hours and 24 minutes.

Answer: C

Scott Woodbury-Stewart
Founder and CEO
[email protected]

Image

See why Target Test Prep is rated 5 out of 5 stars on BEAT the GMAT. Read our reviews

ImageImage

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 7223
Joined: Sat Apr 25, 2015 10:56 am
Location: Los Angeles, CA
Thanked: 43 times
Followed by:29 members

by Scott@TargetTestPrep » Sun Jul 28, 2019 9:23 am
BTGmoderatorDC wrote:If Anil can finish a job in 4 hours and Gustavo can finish the same job in 6 hours, how long would it take them, working together at their respective rates, to complete the job?

A. 1 hour, 50 minutes
B. 2 hours, 10 minutes
C. 2 hours, 24 minutes
D. 3 hours, 45 minutes
E. 4 hours, 30 minutes

OA C

Source: Princeton Review
Their combined rate is 1/4 + 1/6 = 6/24 + 4/24 = 10/24 = 5/12. Therefore, when working together, they can finish the job in 1/(5/12) = 12/5 = 2 2/5 hours, i.e., 2 hours and 24 minutes.

Answer: C