Machines X and Y can work at their respective constant rates to manufacture a certain production unit. If both are working alone, then the time taken by machine Y is what percentage more/less than that of machine X?

(1) Machines X and Y, working together, complete a production order of the same size in two-thirds the time that machine Y, working alone, does.
(2) Machine Y, working alone, fills a production order of twice the size in 6 hrs.

OA A

Source: e-GMAT

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 3008
Joined: Mon Aug 22, 2016 6:19 am
Location: Grand Central / New York
Thanked: 470 times
Followed by:34 members

by Jay@ManhattanReview » Mon Oct 29, 2018 10:49 pm

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

BTGmoderatorDC wrote:Machines X and Y can work at their respective constant rates to manufacture a certain production unit. If both are working alone, then the time taken by machine Y is what percentage more/less than that of machine X?

(1) Machines X and Y, working together, complete a production order of the same size in two-thirds the time that machine Y, working alone, does.
(2) Machine Y, working alone, fills a production order of twice the size in 6 hrs.

OA A

Source: e-GMAT
Say the rate of Machine X is x hours per unit and that of Machine Y is y hours per unit.

Let's take each statement one by one.

(1) Machines X and Y, working together, complete a production order of the same size in two-thirds the time that machine Y, working alone, does.

Part of work done by Machines X and Y, working together = 1/x + 1/y
Part of work done by Machines Y, working alone = 1/y

=> 2/3(1/x + 1/y) = 1/y
= x/y = 1/2.

Time taken by machine Y is [(y - x)/x]*100% = [(2 - 1)/1]*100% = 100% more than that of machine X. Suffcient.

(2) Machine Y, working alone, fills a production order of twice the size in 6 hrs.

No information about Machine X is given. Insufficient.

The correct answer: A

Hope this helps!

-Jay
_________________
Manhattan Review GMAT Prep

Locations: Manhattan Review India | Hyderabad GMAT Prep | Bangalore GMAT Courses | Kukatpally GMAT Prep | and many more...

Schedule your free consultation with an experienced GMAT Prep Advisor! Click here.

User avatar
GMAT Instructor
Posts: 1449
Joined: Sat Oct 09, 2010 2:16 pm
Thanked: 59 times
Followed by:33 members

by fskilnik@GMATH » Tue Oct 30, 2018 2:01 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

BTGmoderatorDC wrote:Machines X and Y can work at their respective constant rates to manufacture a certain production unit. If both are working alone, then the time taken by machine Y is what percentage more/less than that of machine X?

(1) Machines X and Y, working together, complete a production order of the same size in two-thirds the time that machine Y, working alone, does.
(2) Machine Y, working alone, fills a production order of twice the size in 6 hrs.
Source: e-GMAT
$$?\,\,:\,\,{T_X}\,,\,\,{T_Y}\,\,{\rm{relationship}}\,\,\,\,\,\,\left( {? = {T_X}\mathop \to \limits^{\Delta \% } {T_Y} = {{{T_Y} - {T_X}} \over {{T_X}}} = {{{T_Y}} \over {{T_X}}} - 1} \right)$$
Important: the ratio of time taken (for any given job) is the inverse of the ratio of the work done (for any given time).

$$\left( 1 \right)\,\,{{{T_{X \cup Y}}} \over {{T_Y}}} = {2 \over 3}\,\,\,\,\, \Rightarrow \,\,\,\,\,{{{W_{X \cup Y}}} \over {{W_Y}}} = {3 \over 2}\,\,\,\,\, \Rightarrow \,\,\,\,\,\left\{ \matrix{
\,{W_{X \cup Y}} = 3k \hfill \cr
\,{W_Y} = 2k \hfill \cr} \right.\,\,\,\,\, \Rightarrow \,\,\,{W_X} = k$$
$${{{W_Y}} \over {{W_X}}} = {2 \over 1}\,\,\,\,\, \Rightarrow \,\,\,\,{{{T_Y}} \over {{T_X}}} = {1 \over 2}\,\,\,\,\,\, \Rightarrow \,\,\,\,\,{\rm{SUFF}}.$$
$$\left( 2 \right)\,\,{T_Y} = 3{\rm{h}}\,\,\,\left\{ \matrix{
\,{\rm{Take}}\,\,{{\rm{T}}_{\rm{X}}} = 3{\rm{h}}\,\,\,\, \Rightarrow \Delta \% = 0 \hfill \cr
\,{\rm{Take}}\,\,{{\rm{T}}_{\rm{X}}} = 4{\rm{h}}\,\,\,\, \Rightarrow \Delta \% \ne 0 \hfill \cr} \right.$$

This solution follows the notations and rationale taught in the GMATH method.

Regards,
Fabio.
Fabio Skilnik :: GMATH method creator ( Math for the GMAT)
English-speakers :: https://www.gmath.net
Portuguese-speakers :: https://www.gmath.com.br

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Tue Oct 30, 2018 2:30 am

Timer

00:00

Your Answer

A

B

C

D

E

Global Stats

BTGmoderatorDC wrote:Machines X and Y can work at their respective constant rates to manufacture a certain production unit. If both are working alone, then the time taken by machine Y is what percentage more/less than that of machine X?

(1) Machines X and Y, working together, complete a production order of the same size in two-thirds the time that machine Y, working alone, does.
(2) Machine Y, working alone, fills a production order of twice the size in 6 hrs.
Statement 1:
Time and rate have a RECIPROCAL relationship.
Since X and Y together take 2/3 as long as Y alone, X and Y together work 3/2 as fast as Y alone.
Thus, if Y's rate alone = 2 units per hour, then X and Y's combined rate = (3/2)(2) = 3 units per hour, implying that X's rate alone = 3-2 = 1 unit per hour.
Since Y works twice as fast as X, Y's time will be 1/2 X's time.
In other words:
Y's time will be 50% less than X's time.
SUFFICIENT.

Statement 2:
No information about X's rate or time.
INSUFFICIENT.

The correct answer is A.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3