assembly line alpha starts and creates widgets at a rate of 25 w per hour. exactly one hour later, assembly line beta begins production at a rate of 30 w per hour. in how many minutes will the two assembly line have produced the same number of widgets?

1) 5
2) 25
3) 250
4) 300
5) 350

I like to know the formula for this and how to solve it (i reached different number)

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 16207
Joined: Mon Dec 08, 2008 6:26 pm
Location: Vancouver, BC
Thanked: 5254 times
Followed by:1268 members
GMAT Score:770

by Brent@GMATPrepNow » Thu Mar 26, 2015 8:09 am
mehrasa wrote:assembly line alpha starts and creates widgets at a rate of 25 w per hour. exactly one hour later, assembly line beta begins production at a rate of 30 w per hour. in how many minutes will the two assembly line have produced the same number of widgets?

A) 5
B) 25
C) 250
D) 300
E) 350

I like to know the formula for this and how to solve it (i reached different number)
Assembly line alpha starts and creates widgets at a rate of 25 w per hour. Exactly one hour later, assembly line beta begins....
So, in that 1 hour, assembly line alpha makes 25 widgets.
In other words, assembly line alpha has a 25-widget lead on assembly line beta.

Exactly one hour later, assembly line beta begins production at a rate of 30 w per hour
So, EVERY HOUR, assembly line beta makes 5 widgets more than assembly line alpha.
Since assembly line alpha has a 25-widget lead on assembly line beta, it will take 5 HOURS for assembly line beta to make up for that 25-widget deficit.

in how many MINUTES will the two assembly line have produced the same number of widgets?
5 HOURS = 300 minutes
Answer D

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image

User avatar
Master | Next Rank: 500 Posts
Posts: 154
Joined: Wed May 21, 2014 4:29 am
Thanked: 8 times
Followed by:1 members

by talaangoshtari » Thu Mar 26, 2015 8:25 am
h w_alpha w_beta

1 25 0
2 50 30
3 75 60
4 100 90
5 125 120
6 150 150

So, from the moment that they work together, it takes 5 hour or 300 minutes for producing the same number of widgets.

GMAT/MBA Expert

User avatar
GMAT Instructor
Posts: 16207
Joined: Mon Dec 08, 2008 6:26 pm
Location: Vancouver, BC
Thanked: 5254 times
Followed by:1268 members
GMAT Score:770

by Brent@GMATPrepNow » Thu Mar 26, 2015 10:32 am
assembly line alpha starts and creates widgets at a rate of 25 w per hour. exactly one hour later, assembly line beta begins production at a rate of 30 w per hour. in how many minutes will the two assembly line have produced the same number of widgets?

A) 5
B) 25
C) 250
D) 300
E) 350
We can also solve this algebraically.

Let t = number of HOURS that assembly line beta works
So, t + 1 = number of HOURS that assembly line alpha works

Also, assembly line beta's rate = 30 widget per hour
And, assembly line alpha's rate = 25 widget per hour

Now, start with a WORD EQUATION...
# of widgets that assembly line alpha produces = # of widgets that assembly line beta produces
Production = (rate)(time)
So, (25)(t + 1) = (30)(t)
Expand: 25t + 25 = 30t
Rearrange: 25 = 5t
Solve: t = 5
So, assembly line beta must work for 5 HOURS

5 hours = 300 minutes.
Answer: D

Cheers,
Brent
Brent Hanneson - Creator of GMATPrepNow.com
Image

User avatar
GMAT Instructor
Posts: 15539
Joined: Tue May 25, 2010 12:04 pm
Location: New York, NY
Thanked: 13060 times
Followed by:1906 members
GMAT Score:790

by GMATGuruNY » Thu Mar 26, 2015 12:11 pm
mehrasa wrote:assembly line alpha starts and creates widgets at a rate of 25 w per hour. exactly one hour later, assembly line beta begins production at a rate of 30 w per hour. in how many minutes will the two assembly line have produced the same number of widgets?

1) 5
2) 25
3) 250
4) 300
5) 350
An alternate approach is to PLUG IN THE ANSWERS. which represent the total time for Beta.
Since Alpha begins to work one hour earlier than Beta, Alpha's total time is 1 hour longer than Beta's total time.
When the correct answer choice is plugged in, Beta and Alpha will produce the same number of widgets.

Answer choices A and B seem way too small.
Of the remaining answer choices, start with the option in the middle (D).

Answer choice D: 300 minutes = 5 hours
At a rate of 30 widgets per hour, the number of widgets produced by Beta in 5 hours = r*t = 30*5 = 150.
At a rate of 25 widgets per hour, the number of widgets produced by Alpha in 6 hours = r*t = 25*6 = 150.
Success!

The correct answer is D.
Private tutor exclusively for the GMAT and GRE, with over 20 years of experience.
Followed here and elsewhere by over 1900 test-takers.
I have worked with students based in the US, Australia, Taiwan, China, Tajikistan, Kuwait, Saudi Arabia -- a long list of countries.
My students have been admitted to HBS, CBS, Tuck, Yale, Stern, Fuqua -- a long list of top programs.

As a tutor, I don't simply teach you how I would approach problems.
I unlock the best way for YOU to solve problems.

For more information, please email me (Mitch Hunt) at [email protected].
Student Review #1
Student Review #2
Student Review #3