19. To help preserve ancient Egyptian monuments threatened by high water tables, a Swedish engineering firm has proposed installing pumps, perhaps solar powered, to lower the underground water level and dig trenches around the bases of the stone walls.
(A) to lower the underground water level and dig trenches
(B) to lower the underground water level and to dig trenches
(C) to lower the underground water level and digging trenches
(D) that lower the underground water level and that trenches be dug
(E) that lower the underground water level and trench digging
ancient Egyptian monuments
This topic has expert replies
-
- Legendary Member
- Posts: 1799
- Joined: Wed Dec 24, 2008 3:03 am
- Thanked: 36 times
- Followed by:2 members
IMO C.
To help preserve ancient Egyptian monuments threatened by high water tables, a Swedish engineering firm has proposed installing pumps, perhaps solar powered, to lower the underground water level and dig trenches around the bases of the stone walls.
(A) to lower the underground water level and dig trenches
installing....digging should be parallel...
lower and dig is incorrect parallelsim.
(B) to lower the underground water level and to dig trenches
installing....digging should be parallel...
lower and dig is incorrect parallelsim.
(C) to lower the underground water level and digging trenches
Correct
(D) that lower the underground water level and that trenches be dug
that trenches is parallel to that lower...wrong parallelism.
(E) that lower the underground water level and trench digging
installing....digging should be parallel...
To help preserve ancient Egyptian monuments threatened by high water tables, a Swedish engineering firm has proposed installing pumps, perhaps solar powered, to lower the underground water level and dig trenches around the bases of the stone walls.
(A) to lower the underground water level and dig trenches
installing....digging should be parallel...
lower and dig is incorrect parallelsim.
(B) to lower the underground water level and to dig trenches
installing....digging should be parallel...
lower and dig is incorrect parallelsim.
(C) to lower the underground water level and digging trenches
Correct
(D) that lower the underground water level and that trenches be dug
that trenches is parallel to that lower...wrong parallelism.
(E) that lower the underground water level and trench digging
installing....digging should be parallel...
To help preserve ancient Egyptian monuments threatened by high water tables, a Swedish engineering firm has proposed installing pumps, (perhaps solar powered, to lower the underground water level) and digging trenches around the bases of the stone walls.
hence C
hence C
-
- Master | Next Rank: 500 Posts
- Posts: 122
- Joined: Fri May 22, 2009 10:38 pm
- Thanked: 8 times
- GMAT Score:700
swedish firm has suggested 2 things
Installing pumps
Digging trenches
hence C
Ketoag, i think you are seeing only the underlined part.
Installing pumps
Digging trenches
hence C
Ketoag, i think you are seeing only the underlined part.
-
- Master | Next Rank: 500 Posts
- Posts: 177
- Joined: Wed Jul 16, 2008 11:06 am
- Thanked: 2 times
- Followed by:1 members
Tricky question I first went with B but ,
To help X …..has proposed 1) installing pumps….. to lower Y and 2) digging trenches
To help X …..has proposed 1) installing pumps….. to lower Y and 2) digging trenches
Please do not post answers visibly . Please hide them or post them later after the discussion.